FinM
Deployment
Guide
Release
4.5.10
2
‐
32
On
‐
Surface
vs.
Skyline
/
Elevated
Train
Site
Installation
Figure
2
‐
62:
Exposing
the
tacky
side
of
the
sealing
tape
3. After
connecting
a
cable
to
a
unit,
tighten
the
cable
gland
cap
firmly
and
use
the
insulation
tape
to
fully
cover
the
cable
gland.
Figure
2
‐
63:
Waterproofing
an
external
connection
2.2.10
On
‐
Surface
vs.
Skyline
/
Elevated
Train
TBS
•
Height
•
Power
RADWIN
PoE
•
PoE
3rd
Switches
•
Connectors
Antennas
•
2X2
‐
Type