Pay attention that the ionizer become heated during normal work.
4. CONSTRUCTION OF IONIZER DJ-02 I DJ-03
There are two modules in ionizer construction:(see figure below):
1 – high voltage generator,
2 – ionizing frame.
5. UNPACKING
5.1. Unpacking
Unpack the ionizer and remove protective foams. Take the ionizer out off the box and
put it in place of usage very carefully.
6. STARTING
Air ionizer start up, requires plugging it to the mains and setting the main switch key to
position ON. The main switch key is located on housing of high voltage generator.
Switching on the air ionizer is signalled by a glowing diode of the main switch key.