4GT LTE Cat-M1 Installation Manual
2019
Page | 9
2 INSTALLATION
Physical installation process
For your convenience there are two methods of mounting the 4GT
Screw on method
1.
Remove the top cover and pull out the contact terminal
2.
Remove the PCB board
3.
Fix the bottom part to the suitable place with screws
4.
Place the PCB board back into the case, insert contact terminal
5.
Screw cellular antenna on
6.
Close the top cover
Stick on method
Using the supplied double-sided tape or velcro, fasten the 4GT to any suitable surface that
accomodates adhesive tape