background image

USER INSTRUCTIONS

 

 

1

BOILER OPERATING INSTRUCTIONS 

 

 

Make sure that the authorised technician who tested the boiler has stamped the guarantee booklet. 

 

 

The installation, first start-up, regulation and maintenance operations must be carried out exclusively by qualified 
personnel  (e.g.  Radiant  authorised  Service  Centres).  Incorrect  installation  can  cause  damage  to  property  and 
injury to persons or animals, for which the manufacturer will not be held responsible.

 

During the installation, the technician must carry out the following checks: 

  The data on the data plate must correspond to that of the mains supply networks (gas, electricity, water). 

  The boiler must be regulated according to its designed use and performance. 

  The flue gas exhaust and combustion air intake system must be correctly installed and operational. 

  The  exhaust  gas  discharge  and  ventilation  systems  must  comply  with  the  requirements  of  national  and  local 

standards  regardless  of  whether  the  boiler  is  installed  indoors,  outdoors  or  in  its  own  cabinet  (see  section 
“Reference standards”. 

General warnings 

 

If there is any doubt as to whether the appliance has been tested by an authorised technician, do not attempt 
to start it. All maintenance and gas conversion operations MUST BE CARRIED OUT BY PROFESSIONALLY 
QUALIFIED PERSONNEL, registered in accordance with current legislation.

 

 

Make  sure  that  the  requirements  relating  to  the  air  intake  and  ventilation  of  the  room  in  which  the 
boiler is to be installed have been complied with. 

 

The  boilers  can  be  installed  outdoors  in  a  partially  protected  location,  in  accordance  with  current 
standards and where the minimum external temperature does not fall below –10°C.  The manufacturer 
will not be held responsible for installation in locations where the temperature falls to below –10°C.  

 

The  boiler  is  fitted  with  an  antifreeze  system.  If  the  boiler  is  installed  in  a  location  where  there  is  a  risk  of 
freezing,  the  anti-freeze  system  will  only  come into  operation if  the  power  is  on  and  the  gas  supply valve is 
open (the frost protection is active even with the ON/OFF switch in OFF position). The manufacturer will not 
be held responsible for damage to the boiler caused by non-compliance with this instruction. 

 

Should any part of the boiler freeze-up, do not attempt to light it under any circumstances, but instead call the 
Service Centre immediately.  

 

The Benchmark Book is an integral part of an installation. The Benchmark handbook should be filled-in each 
time a boiler is installed. In addition to checking the combustion, all ordinary and extraordinary maintenance 
operations must be reported in the booklet together with the name of the person carrying out the maintenance 
and, where applicable, his company. 

 

The  appliance’s  combustion  system  must  be  checked  every  two  years.  This  check  includes  testing  the 
efficiency  of  the  boiler  and  must  be  carried  out  by  authorised  personnel  possessing  the  qualifications  as 
required by current law. 

 

Do  not  obstruct  the  ventilation  openings  in  rooms  where  there  are  gas-burning  appliances  installed  (boiler, 
cooker, etc.). 

 

If you smell gas … 

 

DO NOT ACTIVATE ANY ELECTRIC SWITCHES, TELEPHONES OR ANY OTHER DEVICE THAT MAY 
GENERATE ELECTRICAL DISCHARGES OR SPARKS. 

 

OPEN DOORS AND WINDOWS IMMEDIATELY TO CREATE A CURRENT OF AIR THAT WILL RAPIDLY 
CLEAR THE ROOM. 

 

CLOSE ALL GAS TAPS AND VALVES. 

 

CALL FOR PROFESSIONALLY QUALIFIED PERSONNEL. 

 

Reviews: