9
R1KG 24 - RAD - ING - Manuale - 1806.1_SK.2
1 Av
ve
rte
nz
e gener
ali
pe
r l'in
stall
azione
_
Lo
ca
le
ca
ld
aia
_
co
nd
_
E
N
1. INSTALLATION
INST
ALLER
WARNING
If the temperature in the boiler installation
location goes below -10° centigrades, please fill
the plant with anti-freeze liquid and insert and
electrical resistances kit (see chapter ‘ANTI-FREEZE
PROTECTION’).
WARNING
The manufacturer will not be held
responsible for damages caused by incorrect
installation not in conformity with the over mentioned
instructions and not protected adequately from the
freeze.
1.1.3. REFERENCE LEGISLATION
The installation must be realized according to
the requirements of current legislation and in
compliance with local technical regulations,
according to the indications of the good technique.