2. INSTALLATION
INST
ALLER
WALL INSTALLATION BY MEANS OF A FIXING FRAME
WARNING
In order to avoid condensate stagnations inside the condensate module, check that the boiler is
slightly inclined towards the rear part (1-1.5°) in order to evacuate the condensate.
WARNING
The device must be installed only on a vertical solid wall, able to sustain its weight.
To facilitate the assembly, the boiler is equipped with a template and a frame that allow to prepare in
advance the connections to the pipes with the possibility to install the boiler only when masonry works are
completed. For assembly follow the instructions below:
1. With the help of a spirit level, fix the mounting template to the wall where you intend to install the
boiler, mark the points to insert the ø10 dowel screws and points for the heating flow and heating
return system’s connections.
2. Make the holes and fix the frame to wall (Figure 1).
3. Hook the boiler using the slots on the frame (Figure 2).
4. unscrew the fixing screws of the lower bracket (fig. 3) ensuring the free sliding of the bracket towards
the boiler;
5. adjust the inclination of the boiler (fig. 4) by sliding the lower bracket ensuring an inclination of the
boiler, against the vertical, of about 1–1.5°.
1-1.5°
fig.2
fig.1
fig.3
fig.4
LOWER BRACKET
LOWER BRACKET