
FOM-E1/T1 Ver. 2.0
Package Contents
2-1
Chapter 2
Installation and Setup
2.1 Introduction
This chapter describes installation and setup procedures for the standalone
FOM-E1/T1 modem.
FOM-E1/T1 is delivered completely assembled. It is designed for tabletop
installation.
After installing the unit, refer to
Chapter 3
to assure normal operation.
In case a problem is encountered, refer to
Chapter 4
for test instructions.
Before installing the product, review
Handling Energized Products
at the
beginning of the manual.
2.2
Site Requirements and Prerequisites
Before installation, review
Handling Energized Products
in the front matter of this
manual.
AC-powered FOM-E1/T1 units should be installed within 1.5m (5 ft) of an
easily-accessible grounded AC outlet capable of furnishing the voltage in
accordance with FOM-E1/T1 nominal supply voltage.
DC-powered FOM-E1/T1 units require a 24 VDC or -48 VDC power source, which
must be adequately isolated from the main supply.
Allow at least 90 cm (36 in) of frontal clearance for operating and maintenance
accessibility. Allow at least 10 cm (4 in) clearance at the rear of the unit for signal
lines and interface cables.
The ambient operating temperature of FOM-E1/T1 is 0
°
to 50
°
C (32
°
to 122
°
F) at
relative humidity of 90%, non-condensing.
2.3 Package
Contents
The package of the FOM-E1/T1 modem includes:
•
One FOM-E1/T1 unit or FOM-E1/T1/R card
•
Technical documentation CD
Note