![Quooker PRO3-VAQ B Installation Manual Download Page 5](http://html1.mh-extra.com/html/quooker/pro3-vaq-b/pro3-vaq-b_installation-manual_3783377005.webp)
It's recommended that you install the Quooker in the following order:
A. Drilling hole
B1. Fitting Nordic tap
C. Connecting water
D1. Connecting tank to Nordic tap
NOTE: Please bear in mind that the tank, inlet valve and socket must remain
easily accessible for servicing. For an overview of the Fusion tap installation
please refer to the next page.
Overview of Nordic tap installation