![Quooker PRO3-VAQ B Installation Manual Download Page 10](http://html1.mh-extra.com/html/quooker/pro3-vaq-b/pro3-vaq-b_installation-manual_3783377010.webp)
2
3
Connecting water
• The Quooker operates under mains water pressure and must always be fitted
to the water pipe with the supplied inlet valve.
• The Nordic boiling-water tap or the Fusion tap must be installed according to
the locally applicable regulations.
1 Shut off water
Before installation, shut off the angle
stopcock or water supply to the main
water tap. If necessary, fit supplied
angle stopcock.
2 Connect inlet
valve
Connect the inlet valve to the angle
stopcock with the fibre washer.
3 Connect hot
and cold water
hose
Connect the hot water hose with the
water filter to the angle stopcock.
Connect the cold water hose with the
hose filter to the inlet valve.
1
C
If necessary
If only a G
1
⁄
2
"
connection is present,
use one of the G
1
⁄
2
"
couplings with the
supplied packing rings.