![Quirk Logic Quilla Series Installation & Safety Manual Download Page 4](http://html1.mh-extra.com/html/quirk-logic/quilla-series/quilla-series_installation-and-safety-manual_3750732004.webp)
4
5.
Use the base of the wall-mount and install a screw to the center screw hole anchor, so you can level and
mark the other holes.
6.
Use the 4’
level to align the base of the wall-mount. Mark all anchor locations on the wall (with a screw)
as identified in the diagram below. There are a total of 9 screw locations including the center anchor
(See Figure 2).
7.
Remove the base of the wall mount and use a screwdriver to install all drywall anchors into your
drywall, if needed.
8.
Once anchors are installed, install the base of the wall-mount back on the wall using the screws
provided, into anchors.
9.
Install the power brick as shown. Wrap the attached cable around guides and plug the DC power plug
into the DC power socket.
(See Figure 3)
Figure 2
–
Anchor Locations Based on Template
2
6
4
3
5
3
1
7
8
7
9
Figure 3
–
Power & Ethernet