5HPRYDO3URFHGXUH
5.Remove the
reactor and isolation sheet
6.Remove
4-way valve assy and
condenser
condenser
Remove screws fixing
reactor
and then remove the
reactor.
Remove screws fixing isolation sheet and then
remove the isolation sheet.
reactor
isolation sheet
Procedure
Steps
4-way valve assy
Discharge the refrigerant completely;unsolder the
pipeline connecting the compressor and the
condenser assy,and then remove the 4-way valve
assy.
Remov screws between condenser and chassis-
sub-assy.Then remove condenser.