34
EN
INSTALLATION AND USE MANUAL
QUICK MC² X3_DC
REV001A
DC
11.0 - Scrapping
The machine should be scrapped adopting safety measures that take account of the logistic and environmental conditions
and the state of wear.
In general it is necessary to realise the demolition following the subsequent indications:
- The operator has to dress up protecting clothes and accessories (helmet, anti-accident shoes, gloves, possibly eyeglasses
and mask) homologated following the anti-accident norm on force.
- Make sure that the machine has been disconnected form all power sources.
- Check that the hydraulic, pneumatic and water systems (including the accumulators) are completely empty. Drain if
necessary.
It is forbidden to disperse the exhausted liquid in the environment, because it causes pollution.
- Check all pressurised systems, depressurising them if necessary.
- Break down the machine into easily transportable units.
The demolition of the machinemust be assigned to companiesspecialized and trained to executethis kind
of operations.
11 - Scrapping and Disposing
Summary of Contents for MC2 Series
Page 1: ...REV 001A ANTI ROLL GYRO STABILIZER INSTALLATION AND USE MANUAL EN page 3 DC MARCH 2020...
Page 2: ...PAGE INTENTIONALLY BLANK DC...
Page 6: ...PAGE INTENTIONALLY BLANK DC...
Page 37: ...37 EN INSTALLATION AND USE MANUAL QUICK MC X3_DC REV001A DC DC PAGE INTENTIONALLY BLANK...
Page 38: ...38 EN INSTALLATION AND USE MANUAL QUICK MC X3_DC REV001A DC NOTES...
Page 39: ...39 EN INSTALLATION AND USE MANUAL QUICK MC X3_DC REV001A DC DC PAGE INTENTIONALLY BLANK...