GP
Series
EN
B
A
B
C
Nm
8÷10
45°
QUICK
GPSeries
INSTALLATION AND USER’S MANUAL - REV000A
8
4.1 - Installation procedures
A
Identify the ideal position and drill the holes using the
drilling template supplied.
B
Remove the excess material from the rope/chain passage
hole, finish it and smooth it with a specific product (marine
paint, epoxy resin or gel) ensuring the free passage of the
chain.
C
Position the upper section inserting the gasket between
the deck and the base. Fix the windlass by screwing the
nuts onto the fixing studs.
Connect the supply cables from the windlass to the
reversing contactor unit.
STUD
B DECK LEVEL
Ensure that the upper and lower surfaces of the deck are as
parallel as possible. If this is not the case, compensate the
difference appropriately (fig.
B
).
A lack of parallelism could result in a loss of motor power.
The deck thickness must be included among the figures listed
in the table.
In case of different thickness, please contact your Quick
®
dealer.
C PEAK DEPTH AND BOW ROLLER HEIGHT
There must be no obstacles to the passage of cables, rope and chain under deck (fig.
1C
).
Insufficient depth of the peak could cause chain jamming (fig.
2C
).
Max
5 mm (3/6”)
GASKET
NUT
GROWER
1C
2C
40 cm (16”)
4 - Installation