8
USER
’S INSTRUCTIONS FOR MOUNTING THE MINI SOIL CONDITIONER_
Attaching Hydraulics:
1. Connect the hydraulic quick couplers from the
attachment to the loader. Be sure to thread
the hoses through the hose holder on the
loader. Bungee straps can be used as an
alternate method of securing the hoses.
IMPORTANT:
Make sure the quick
couplers are fully engaged. If the quick
couplers do not fully engage, check to see
that the couplers are the same size and
brand. Do not force the quick couplers
together.
IMPORTANT:
Wipe the ends of the
hydraulic quick couplers (both lead and
loader) with a rag to remove any possible
contamination. Contamination can cause
hydraulic components to fail and is not
covered under warranty.
2. If equipped with the hydraulic angle option,
connect the attachment wire harness to the
loader wire harness receptacle.
3. Make sure the hoses are properly routed to
fit your specific loader. If the hoses are not
routed correctly, hoses may get pinched or
rub on tires. Be sure to check the hose
routing through the full range of intended
motion of the attachment before operating it.
More than one routing may be acceptable
depending on the loader. Pick the routing
that best suits your loader.
IMPORTANT:
Proper hose routing is the
responsibility of the owner and/or operator.
Pinched or stretched hoses are not covered
under warranty.
4. Connect the attachment wire harness to the
loader wire harness receptacle.
Mounting is now complete and you are ready to
use the attachment. Use reverse order of
above instructions to dismount the attachment
from the loader.
NOTE:
Attachment is shipped with 12FJX (1-
1/16”
Female JIC Swivel) fittings on the ends of the lead
hoses.
*Always follow manufacturer instructions*
*AAA Rent-All 225-291-1356*