First steps
First dreams
Quax
®
First steps
First dreams
Quax
®
23
Step 4.3
: Use the parts of step
4.1
and
4.2
as well as four bolts
M6*30
mm
Place the upper structure (
E
) on the provided support blocks on the upper crossbars. Push the bolts
(
M6*30
) through the drillings at the bottom of the blocks and fasten in the top.
Use 4.2
: Use the top
E1
, both barriers
E2
, both cross bars
E3
and four bolts
M6*48
mm
Put the barriers (
E2
) on top of the worktop (
E1
) with the provided openings facing downwards. Position a
cross bar (
E3
) with its provided drillings in front of the holes on the barriers (
E2
). Insert two bolts (
M6*48
)
through these drillings and slightly tighten. Repeat these operations for the second cross bar (
E3
).
www
.quax.eu
PROMO
05 05 1200EN-xx
Baignoire et table à langer
Bath and diaper cabinet
Bad- en luiermeubel
Wickel- und Bademöbel