MY HOME
0101D001
Quax nv
Karel Picquélaan 84 B-9800 Deinze Belgium
T
T
0032 9 380 80 95 www.quax.eu -
E
E
Step 4.7 :
Use the posts
8
and
10
. As well as the cross bar
9
and the glue
H
Apply some glue (
H
) to the dril-
lings of the uprights (
8
and
10
).
Push the cross bar (
9
) with its
wooden dowels into the holes
of the upright (
10
). Push the up-
right (
8
) onto the wooden dow-
els of the cross bar.
Step 4.8 :
Use of the mounted bed, the parts of step
4.7
and the two minifi xes
C
Push the minifi xes (
C
) into the drillings on the inside of the chimney. Push the chimney onto the connectors of the rafters
and tighten the minifi xes.
32