background image

4

Unpacking the Autoloader

SuperLoader™ 3A Series Quick Start Guide

Unpacking the Autoloader

Before you begin, clear a desk or table so that you can unpack the autoloader.
The 

SuperLoader 3A Series Quick Start Guide

 

has all the necessary information to unpack 

and inspect your autoloader correctly. 
You also need to select an open 2U computer rack location near the server that will host 

the autoloader.

Carefully unpack and inspect your new SuperLoader 3A Series autoloader by doing the 

following:

1

Inspect the shipping box for damage. If you notice any damage, report it to the 

shipping company immediately.

2

Open the shipping box and remove the accessories package. Set the accessories 

package aside for now.

3

Lift the autoloader and padding out of the box and place it on the work surface, top 

facing up. 

Do not set the autoloader on either end or sides.

4

Carefully remove the shipping padding from the left and right sides of the 

autoloader. Then remove the bag from the autoloader.

5

Remove the foam insert from the magazine bay of the autoloader. Save the packing 

materials in case you need to move or ship the autoloader in the future

.

Caution:

Do not remove the top cover of the autoloader during the installation 

process. Removing the top cover could result in damage to the 

autoloader.

Caution:

If the room in which you are working differs from the temperature in 

which the autoloader was shipped or stored by 15° C (30° F) or more, let 

the autoloader acclimate to the surrounding environment for at least 12 

hours before removing it from the shipping carton.

Caution:

If your unit was ordered as a one-magazine autoloader, be sure to remove 

the plastic shipping insert from the magazine bay before connecting or 

operating your autoloader. Insert either a magazine or a magazine blank 

into the bay. The autoloader will not function without both magazine bays 

equipped with either a magazine or a magazine blank.

Note:

If the cover must be taken off, there are 26 screws that need to be removed.

Summary of Contents for SuperLoader 3A Series

Page 1: ...The autoloader is designed to fit in a standard 19 inch rack using either the long or short brackets depending on the depth of the rack The autoloader uses standard rack mounting hardware Note Notes e...

Page 2: ...ard 19 inch rack Room temperature 10 35 C 50 95 F Power source AC power voltage 100 127 VAC 200 240 VAC Line frequency 50 60 Hz Locate the AC outlet near the autoloader The AC power cable is the produ...

Page 3: ...ttaching it directly to stationary cabinet rails Take the following general safety steps before beginning the rack mount installation 1 Lower the cabinet feet 2 Extend the cabinet anti tip device if a...

Page 4: ...from the left and right sides of the autoloader Then remove the bag from the autoloader 5 Remove the foam insert from the magazine bay of the autoloader Save the packing materials in case you need to...

Page 5: ...rackets Two sets decimal and metric of four support bracket 10 32 x 1 4 inch button head screws two per support bracket TORX L Key drivers T8 and T10 Power cable Documentation CD containing all of the...

Page 6: ...ls of the rack making sure that you install each pair of clip nuts at exactly the same level see figure 2 Figure Description Square rack holes are the most common type of rack holes They can accept ei...

Page 7: ...th of the rack and then attach them to the rear of the autoloader see figure 3 Use the long autoloader brackets 72 A226 A when the distance from the front mounting rail to the rear mounting rail is le...

Page 8: ...ort brackets firmly against the rail while still allowing the support bracket to be slightly shifted by hand This shifting will help facilitate the engagement of autoloader brackets as the autoloader...

Page 9: ...o that the autoloader brackets slide into corresponding support brackets on the rear rails and the tabs at the front of the autoloader align flush with the clip nuts on the front rails see figure 5 Ca...

Page 10: ...nt end of the autoloader to the rack using four rack screws two per tab as shown in figure 6 Tighten the screws just enough to secure the autoloader to the front rails Figure 6 Front Alignment 6 Insta...

Page 11: ...8 When the autoloader is level tighten all screws securing the autoloader to the rack This includes the following Four screws securing the autoloader tabs to the front rails Four screws securing the...

Page 12: ...rts on the back panel allow you to connect to the A Series tape drive FTP file server and to the autoloader remote management interface Figure 9 Back Panel Overview 1 Power switch 2 Mailslot 3 Front p...

Page 13: ...is not check the power connections and your power source During the Power on Self Test POST both LEDs are illuminated briefly followed by only the Ready Activity LED flashing When the initialization s...

Page 14: ...Archive It s What We Do 2007 Quantum Corporation All rights reserved Quantum the Quantum logo and all other logos are registered trademarks of Quantum Corporation or their respective owners 81 81667 0...

Reviews: