background image

Replacing a

n

 

ESM

StorNext 

QD6000/

QD7000 

Expansion Unit

6-68481-01

 Rev A

*

6-68481-01 Rev A

Summary of Contents for StorNext QD6000

Page 1: ...Replacing an ESM StorNext QD6000 QD7000 Expansion Unit 6 68481 01 Rev A 6 68481 01 Rev A...

Page 2: ...1 Rev A July 2016 Product of USA 2016 All rights reserved Quantum the Quantum logo DXi Scalar and StorNext are registered trademarks of Quantum Corporation and its affiliates in the United States and...

Page 3: ...ion Intended audience Prerequisites NetApp to Quantum Naming Decoder Intended audience This guide is intended for storage customers and technicians Prerequisites Prerequisites for installing and using...

Page 4: ...Ms E5600 Code Name Titan RAID controller Four 16Gb s FC SFP host ports E5500 Code Name Soyuz RAID controller Four 16Gb s FC SFP host ports E5400 Code Name Pikes Peak RAID controller Four 8Gb s FC SFP...

Page 5: ...c protection when handling tray components 1 Gather support data about your storage array by using one of these methods Use the storage management software to collect and save a support bundle of your...

Page 6: ...nect the cables correctly on the replacement ESM canister ATTENTION Possible loss of hardware To avoid taking the wrong ESM canister offline contact your Technical Support representative before perfor...

Page 7: ...he new ESM canister Figure 1on page 2 13 Based on the LED status perform one of these actions The ESM Power LED is on and the ESM Service Action Required LED is off Go to step 15 The ESM Power LED is...

Page 8: ...r storage array From the Array Management Window toolbar select Monitor Health Collect Support Data Then name and specify a location on your system where you want to store the support bundle Use the C...