background image

Quantum PX502 Chassis Repacking Instructions
Document 81-81453-02 A01
January 2006

10

Installing the Internal Shipping Restraints

Figure 6  Securing the 
Robotics

Tie band

6

Install the top covers previously removed in 

step 1

.

7

Install the tape drives, and power supplies previously removed in 

Removing the Library from the Rack

.

8

To install the tape magazines, insert the metal pick included with the 

accessory kit into the release holes and trip the magazine door release for 

both the right and left magazine doors (see 

figure 7

).

The magazine access doors open.

Summary of Contents for PX502

Page 1: ...81 81453 02 A01 January 2006 1 Quantum PX502 Chassis Repacking Instructions Introduction 3 Removing the Library from the Rack 3 Installing the Internal Shipping Restraints 6 Packing the Library for Sh...

Page 2: ...his publication from time to time without notice COPYRIGHT STATEMENT Copyright 2003 by Quantum Corporation All rights reserved Your right to copy this document is limited by copyright law Making copie...

Page 3: ...or Shipment Removing the Library from the Rack 0 To remove the PX502 library from the rack Note You must remove all tape cartridges from the library prior to parking the library robotics for shipment...

Page 4: ...ack see figure 1 Note Refer to the PX502 Quick Start Guide PN 81 81292 for additional PX502 rack mount information a Loosen the captive screws securing the tape drives to the chassis and remove the ta...

Page 5: ...Quantum PX502 Chassis Repacking Instructions Document 81 81453 02 A01 January 2006 Removing the Library from the Rack 5 Figure 1 Removing the PX502 Library Power supplies Tape drives Right magazine...

Page 6: ...restraints on the robotics Caution Failure to install the shipping restraints on the robotics may void your warranty To install the internal shipping restraints 1 Place the library on a flat surface...

Page 7: ...ommand was not executed grasp the robotics and gently move it to the front of the library see figure 3 Caution Take standard ESD precautions when working within the library chassis Note If there are a...

Page 8: ...aints Eyelet 4 Install the two halves of the robotics shipping foams as shown in figure 5 a Install the left hand foam first so that it fits down into the robotics platform then push towards the back...

Page 9: ...hown outside of library for clarity Right hand shipping foam Robotics motor Left hand shipping foam Foam inside robotics platform 5 Slide the robotics with the shipping foams under the metal restraint...

Page 10: ...l the top covers previously removed in step 1 7 Install the tape drives and power supplies previously removed in Removing the Library from the Rack 8 To install the tape magazines insert the metal pic...

Page 11: ...ions Document 81 81453 02 A01 January 2006 Installing the Internal Shipping Restraints 11 Figure 7 Opening the Right and Left Magazine Access Doors Right magazine door Door releases Left magazine door...

Page 12: ...he library chassis is placed in an antistatic bag before placing the library in the shipping carton Warning At least two people are required to move the library chassis Caution Lift the library chassi...

Reviews: