980 HDMI Protocol Analyzer Application Guide
– Source Compliance Test Automation
Rev. A1
Page 5
Feb 14, 2013
2
Initial Test Setup Procedures
This section provides preparatory procedures for running the HDMI source compliance test through an Automated
Test System.
2.1
Powering up the 980
In order to set the IP address of the 980/980B you will have to have the 980/980B powered up. Apply power to the
980/980B (which houses the 980 HDMI Protocol Analyzer module) by toggling the rocker type power switch on the
back of the 980/980B. Turn the 980/980B on by pressing and releasing the power button on the lower portion of the
front panel. The power switch in the front is used when you are turning off the 980 Protocol Analyzer for a short
period of time.
Use the following procedures to power up the 980/980B.
1. If necessary, apply power by toggling the rocker type power switch on the back of the 980/980B.
980 Advanced Test Platform
980B Advanced Test Platform
Note
: The power switch in the front is used when you are turning off the 980/980B for a short period of time.
For extended off periods, it is best to power down the 980 by first using the power button on the front and then
the rocker switch on the back.
2. Turn the 980/980B on by pressing and releasing the power button on the lower portion of the front panel.