PART 3 - EXECUTION
3.01 INSTALLATION
A. General: Rig and Install in full accordance with Manufacturers requirements, Project
drawings, and Contract documents.
B. Location: Locate condensing unit as indicated on drawings, including cleaning and
service maintenance clearance per Manufacturer instructions. Adjust and level con-
densing unit on support structure.
C. Components: Installing Contractor shall provide and install all auxiliary devices and
accessories for fully operational condensing unit.
D. Electrical: Coordinate electrical requirements and connections for all power feeds with
Electrical Contractor (Division 16).
E. Controls: Coordinate all control requirements and connections with Controls Contrac-
tor.
F.
Finish: Installing Contractor shall paint damaged and abraded factory finish with touch-
up paint matching factory finish.
Guide Specifications (Cont'd)
Summary of Contents for QCC3
Page 4: ...QUANTECH FORM QCC3 EG1 517 4 THIS PAGE INTENTIONALLY LEFT BLANK...
Page 39: ...FORM QCC3 EG1 517 QUANTECH 39 THIS PAGE INTENTIONALLY LEFT BLANK...
Page 40: ...QUANTECH FORM QCC3 EG1 517 40 Electrical Drawings LD22075a...
Page 41: ...FORM QCC3 EG1 517 QUANTECH 41 Electrical Drawings Cont d 035 21583 101 REV O LD22075b...
Page 42: ...QUANTECH FORM QCC3 EG1 517 42 Electrical Drawings Cont d LD22195a...
Page 43: ...FORM QCC3 EG1 517 QUANTECH 43 Electrical Drawings Cont d LD22195b 035 21583 114 REV J...