
Page 9 of 9
Copyright © 2011 Quality Water Treatment, All right reserved.
rev. 8/2/2011
www.qualitywatertreatment.com
step 2 (BD): 60
extra cycle button
step 3 (RR): 10
extra cycle button
Step 4 (BF): see the appropriate minutes for your system on the chart below.
24,000 Grain system = 8 minutes
32,000 Grain system = 10 minutes
40,000 Grain system = 11 minutes
48,000 Grain system = 14 minutes
64,000 Grain system = 16 minutes
80,000 Grain system = 18 minutes
96,000 Grain system = 20 minutes
110,000 Grain system = 22 minutes
Press the extra cycle button through the rest of the settings, nothing needs to be changed.
Your system is programmed!