background image

 

Page 7 of 14 

 

Copyright © 2009 Quality Water Treatment, All right reserved. 

rev. 10.29.09

                               www.qualitywatertreatment.com 

 

Take the other end of tube slide the Nut and Farrell over it and insert sleeve in to tube. Push 

the tube into the side of the control valve show in photo below. Tighten by hand then snug it 
up with a small wrench.

  

 

 

 

 
                  Programming the Fleck 5600SXT Water Softener control valve: 
 

 

A few simple steps must be followed to program the Fleck 5600SXT Meter Valve.  
 
It will be important to know what your water Hardness and Iron content is before doing this 
programming procedure. If you do not know your water hardness or iron content you should 
either look up your city water quality report by going to Google and typing in: water quality 
report enter you water supply company or the city that you are in, or take a 8 oz sample to a 
pool supply store or send one to us to have it tested. 
 
Your Hardness test results may indicate GPG, PPM, or Mg/L. It is important to note that PPM 
and Mg/L are the same measure and both figures can be treated interchangeably. If you get 
a hardness figure in PPM or Mg/L, please divide this number by 17.1 to get Grains Per 
Gallon “ GPG” 
 
Iron results should also be measured in either PPM or Mg/L. Add your level of iron multiplied 
by 3. Add this number to your hardness level. This figure will be your Total hardness content 
that you will program into your softener system. 

Example if water hardness is 10 GPG and 

the iron is 1 PPM or Mg/L take the iron content of 1 and x 3 = 3 GPG hardness plus 10 
GPG = total compensated hardness 13 GPG

 

 
First plug in your 5600SXT Valve to a nearby outlet. The system will illuminate 4 digits and 
show the time of day and the amount of gallons remaining. This display will switch between 
these values about every 5 seconds.  
 
Set the time on the system to 12:01 PM by pressing either the UP or DOWN arrow as shown 
in picture below. You can hold the button to allow the time to scroll faster.  

Summary of Contents for Fleck 5600 SXT

Page 1: ...nnect to the softener for use during each regeneration Standard US plug 120v 60hz the softener system includes a 5ft power cord and plug Be sure the plug is not connected to a light switch Make a list...

Page 2: ...er and lead free solder An average cost of 40 00 NOW THAT YOU HAVE ADDED THE RESIN AND CONNECTED THE CONTROL VALVE TO THE TANK YOU ARE READY TO INSTALL FOLLOW THESE INSTRUCTIONS 1 Turn off the main wa...

Page 3: ...valve meter assembly and secure it with the two small stainless steel clamps 7 Now position the water softener unit in place for final water line installation making sure the bypass valve is set in t...

Page 4: ...e to a house drain where your washing machine drain line goes is an excellent choice if this is not possible then you can drain into multiple areas make sure you always leave an air gap if going into...

Page 5: ...flow with water The safety float does not dictate the water level in your brine tank Measure from the top of the air check shown as 1 10 to bottom of float show as 2 in photo below you may have to gen...

Page 6: ...the whole in the brine tank and into the brine well Slip the plastic nut and the two ferules one black and one white over brine tubing then push brass insert and screen into brine tubing as shown in...

Page 7: ...have it tested Your Hardness test results may indicate GPG PPM or Mg L It is important to note that PPM and Mg L are the same measure and both figures can be treated interchangeably If you get a hard...

Page 8: ...on once as shown in the photo below Extra cycle button To enter master programming mode press the UP and DOWN buttons together and hold for 5 seconds and then release the buttons as shown in picture b...

Page 9: ...ange this value and press the Extra Cycle Button once to continue The display should now show CT Fd as shown in the picture below This indicates Control Type Meter Delayed Do not change this value and...

Page 10: ...the Extra Cycle Button once to continue when finished The display should now show H 20 as shown in picture below This indicates the Hardness is 20 grains Use the UP or DOWN button to change this valu...

Page 11: ...finished The display should now show DO 14 as shown in the picture below This indicates the Day Override is 14 days the system will regenerate on the 14TH day if the meter does not otherwise automatic...

Page 12: ...Extra Cycle Button once to continue The display should now show BD 60 as shown in picture below This indicates Brine Draw Time is 60 minutes Do not change this value and press the Extra Cycle Button o...

Page 13: ...may now show FM t0 7 as shown in picture below This indicates Flow Meter type 3 4 Turbine Do not change this value and press the Extra Cycle Button once to continue if this value is different use the...

Page 14: ...n if applicable and turn cold water on slowly this will bleed the air from the tank let the water run until it clears If you sized your water softener using our recommendation then you will go through...

Reviews: