Help: 888-426-5001
QualityWaterForLess.com
3) Before filling the tank, place a piece of painter’s
tape over the top of the riser to prevent resin
from dropping down inside the riser tube as
shown in
Figure 9-a.
i
avoid using duct
tape which leaves behind unwanted residue
4) Place the included filling funnel over the top of
the tank as shown in
Figure 9-B
and prepare to
fill the tank. If your softener system came with
gravel
, please pour this into the tank
first
, then
pour in the included resin media afterwards
f I G u r e 9 - a
f I G u r e 9 - b
3 ›I n s ta l l I n G t H e f l ec k 2 510 sx t Va lV e
1) Remove the filling funnel and tape and while
using the included silicone lubricant packet, lu-
bricate the inner and outer o-rings on the bottom
of the Fleck 2510 SXT Meter Valve as shown in
Figures 9-C and 9-D
2) Next, install the
top screen (standard or fine
mesh)
to the bottom of the Fleck 2510 SXT Meter
Valve as seen in Figure 9-E and then place the
valve onto the top of the tank, being sure that the
riser tube fits into the central o-ring on the valve,
as shown in Figure 9-F.
Hand-tighten
the valve to
the tank.
do not use teflon tape or pipe dope
on the valve or tank threading
f I G u r e 9 - c
f I G u r e 9 - e
f I G u r e 9 - d
f I G u r e 9 - f
s ta n d a r d
f I n e M e s H