810-1902-03 Rev D TM1 Installation Guide
7
Monitor Installation
CAUTION:
Do not attempt to install your TM1 On-Line Transformer Monitor until you have read and
fully understand the procedures outlined in this document.
Installation of the TM1 consists of the following:
Site preparation
Mounting the monitor
Wiring the monitor
Bleeding air from the monitor
Configuration
Site Preparation
NOTE
: Serveron recommends a
minimum
size of 1” for the transformer oil supply valve and a
minimum
of
6” vertical clearance between the valve centerline and the transformer foundation for proper installation space.
Ensure the following prior to mounting the monitor:
An adequate valve location for mounting the TM1 monitor has been identified
Power is present and available at the installation site for the monitor
Transformer is oil-filled
All shipped items have been located
Tools / Materials Required
The following tools are required for installation of the TM1 monitor:
7/16”, ½”
and 1 ½” wrenches (or an adjustable wrench)
1/8”, 3/16”and 3/32” Allen keys (3/16” Allen key used for optional Moisture Kit only)
Small flat-blade screw driver
Large flat-blade or Phillips screwdriver
Teflon tape and pipe-thread sealant
Wire strippers/cutters
Container to collect oil during installation
Pipe wrench