
17
Central Pump Systems…
Tank Assembly will be pre-assembled & pre-wired direct from factory.
- Mount the pump using a minimum of two 7/16” bolts, nuts & lock washers.
- Plumbing is shown in Fig. 2 below, use 9/16” wrench and be careful not to under or over-tighten the hydraulic fittings.
Sometimes marking the hydraulic lines with tape may make it easier.
- DO NOT install the top extend lines to the jacks themselves yet, this will be done later in installation.
- The main wire harness will plug directly into the 14-pin connecter that is pre-wired to the assembly.
- Route the ground cable (attached to ground shown below) to a grounded surface on the vehicle frame.
- Finally installing the plastic three sided tank cover, this should be done later on in the assembly.
- The tank cover will need to be trimmed to your liking around the hydraulic lines. Fasten the tank cover with at least
two self-threading screws, be careful not to puncture the plastic reservoir.
Fig. 2
12V POWER
4ga. Cable Eyelet
GROUND
Central tank assembly is typically located near the “center” of the unit, Example: In front of rear axle on driver
side frame rail (outside or between rails). Can be mounted to existing boxes, sub-frame, etc.