R
Septemer 1, 2008
7014-083E
Page 15
CB1200-I Pellet Insert
C. Full Reline With Outside Air
Figure 15.1
Outside Air
Termination
at
Chimney Top
Outside Air
through
Rear Wall
Exit through the
Ash Clean-Out of
Masonry Chimney
12” (305mm)
min. below
12” (305mm)
min. above
NOTE; Use metal
plate around
exhaust vent pipe
and seal all edges
with non-flammable
insulation such as
fiberglass, mineral
wool or ceramic.
Do not use high
temperature caulk-
ing materials to seal
any edge to prevent
future serviceability
NOTE:
Check clearances carefully for this
type of installation to ensure adequate room
for outside air venting.
Check building codes prior to installation.
• Installation MUST comply with local, regional,
state and national codes and regulations.
• Consult local building, fire officials or authorities
having jurisdiction about restrictions, installa-
tion inspection, and permits.
CAUTION
NOTE:
In Canada, only a full reline is
allowed per ULC S-628, ORD ULC C1482.