
18
7021-154J
May 12, 2017
CASTILE FREESTANDING
6
Appliance Set-Up
A. Outside Air Kit Instructions
Parts Included in Kit:
1 piece of 2 inch x 3 foot flex hose, 2
hose clamps, 1 collar assembly,1 termination cap assembly,
1 trim ring, 12 screws.
Tools Needed:
Phillips head screwdriver; wire cutters; hole
saw or jig saw.
1.
Figure
18.1
shows bottom of convection blower mount
and pre-cut air vent opening for reference only. Air
channel should be mounted with appliance in upright
position.
2. Align hooks in air channel with slots in convection blower
mount and ash box,
Figure
18.2
. Push up and slide for
-
ward.
3. Secure air channel to appliance with
2
screws and
s
ecure
the
collar assembly to
the
air channel with
2
screws.
Figure 18.3.
CAUTION
Never draw outside combustion air from:
• Wall, floor or ceiling cavity
• Enclosed space such as an attic or garage
Flex Hose
Hose Clamp
Collar Assembly
Trim Ring
Termination
Cap Assembly
Hose Clamp
Air Intake Channel
(Discard)
Figure 18.2
Figure 18.1
Mounting Slots
Pre-cut Hole
Align hooks with slots, push up
and slide forward
Attach air channel to stove with 2 screws
Attach collar to air channel with 2 screws
Figure 18.3
Figure 18.4
1. Measure distance from floor to air vent opening in appli
-
ance and mark location on wall.
Use saw to cut opening in wall. Cut a 2-1/2 to 3 inch
(64-76mm) opening on inside wall and a 3 to 3-1/2 inch
(76-89mm) opening on outside of house.
2. Use hose clamp to secure flex pipe to collar assembly.
3. Slide trim ring over flex pipe and run pipe through wall.
4. Attach hose to outside termination cap with second hose
clamp.
5. Secure termination cap to outside surface.
6. Secure trim ring to interior wall.