DUCT RUN REQUIREMENTS
MAXIMUM Duct Run = 40-ft. (12 m)
MINIMUM Duct Run = 36 in. (914 mm)
DUCTING MATERIAL
6 in. (152 mm) B-Vent Only
DO NOT duct into existing furnace plenum
MINIMUM CLEARANCE TO COMBUSTIBLES
1 in. (25 mm) from the B-Vent
1/2 in. (13 mm) from top & bottom of outlet box
0 in. (0 mm) from the sides of outlet box
12 in. (305 mm) from wall register to ceiling
Refer to Figure 3.15.
CAUTION!
ALL wiring should be done by a qualified elec-
trician and shall be in compliance with local codes and
with the National Electric Code NFPA/NEC No.
70-current.
CSC22.1 Canadian Electric Code.
Possible Air Duct Runs / Locations
Figure 3.15 Minimum Clearances to Combustibles
Ceiling Register
Wall Register
Floor Register
Two Duct Kits
Ceiling Register
12 in. (305mm) minimum clearance
from register to ceiling
J. Heat Zone Kit (Optional)
The Heat-Zone accessory kit conveys warm air from the
fireplace through air duct(s) to remote locations in the
same room or other rooms of the building. You may install
1 or 2 Heat-Zone kits on the fireplace. Installation of this
kit
MUST
be performed by a qualified service technician.
If any parts are missing or damaged, contact your local
dealer before starting installation. DO NOT install a dam-
aged kit.
This kit is tested and safe when installed in accordance
with this installation manual. It is your responsibility to
read all instructions before starting installation and to fol-
low these instructions carefully during installations.
The Heat-Zone® Wood kit is carefully engineered and
must be installed only as specified. If you modify it or any
of its components you will void the warranty and you may
possibly cause a fire hazard. Installation must be done
according to applicable local, state, provincial and/or
national codes.
Plan the location of the fireplace and warm air duct run(s).
20
Quadra-Fire • 7100 FP • 433-3610 Installation Manual • Rev G • 5/27/14