Maintenance Processes
10.4
Maintenance process details
The maintenance processes listed below are only to be completed on request from by
Customer Service.
Check that your Mailing System is connected to the LAN or modem before starting.
As supervisor (see
on page 130):
Press
and select the path:
Maintenance
Processes
1.
Remove the Base
- Remove the base from service.
- Prepares the base for removal by saving data on USB key.
2.
Withdraw the Meter
- Remove Meter from service.
- Requires a password from Customer Services to perform.
3.
Update Registration
- This procedure is used if you have changed your address.
- Contact your Customer Service to change your information then you will be
instructed to perform the update registration procedure.
Performing the Update Registration Procedure to Change
your Address
This procedure is to be used if you have changed address.
First contact your Customer Service to update your details, then you will be instructed
to perform the update registration procedure.
186
| Page 186 | Jul-24-2023 01:56 |
10
Maintaining
your
Mailing
System
Summary of Contents for IS-350
Page 1: ...User Guide IS 350 Mailing Systems...
Page 5: ...Page 4 TOC Jul 24 2023 01 56...
Page 7: ......
Page 15: ......
Page 17: ......
Page 31: ......
Page 33: ......
Page 67: ......
Page 69: ......
Page 77: ......
Page 79: ......
Page 95: ......
Page 97: ......
Page 111: ...Content 106 Page 106 Jul 24 2023 01 56 6 Reports...
Page 123: ......
Page 131: ......
Page 145: ...3 Press OK to validate 140 Page 140 Jul 24 2023 01 56 8 Configuring your Mailing System...
Page 151: ...Geodesic map 146 Page 146 Jul 24 2023 01 56 8 Configuring your Mailing System...
Page 152: ...Geodesic codes 8 Configuring your Mailing System 147 Page 147 Jul 24 2023 01 56...
Page 163: ......
Page 165: ......
Page 179: ......
Page 193: ......
Page 195: ......
Page 203: ......
Page 211: ...A0154022 A 24 07 2023...
Page 212: ...A0154022 A 24 07 2023...