Mail Processing Data
6.3
Daily Usage Report
This report displays, usage data such as total items processed and total postage used for
each day within a selected time period.
Report Requirements:
• You have to specify the period for the report (Begin date and End date). These dates
can be user defined or set automatically by your system.
If you do not specify these dates, your system will set the dates to the Default Settings
which are:
Default period:
- Begin = 1st day of the current month.
- End = current day.
If you choose to specify the Begin Date, your system will propose an End Date for
your report.
The proposed End Date is always the Begin Date + 31 days.
If the proposed End Date does not meet your needs you can specify an End Date of
your choice. But the maximum is Begin Date + 31 days.
Outputs Devices:
• Screen
• USB Printer
• USB Memory Key.
Comments
Fields
Only appears on printed re-
ports.
Die number
For each day in the period the report displays:
• The Day .
• The number of items processed (zero and nonze-
ro).
• Total postage used on this day.
See also
•
on page 80 .
82
| Page 82 | | |
6
R
epor
ts
Summary of Contents for IS-280
Page 1: ...Mailing Systems Operator Manual IS 280...
Page 5: ...Page 4 TOC...
Page 7: ......
Page 13: ......
Page 15: ......
Page 27: ...How to Count Mail pieces by Weighing 53 22 Page 22 Processing Mail...
Page 59: ......
Page 61: ......
Page 67: ......
Page 81: ......
Page 95: ......
Page 105: ...4 e...
Page 107: ......
Page 115: ......
Page 134: ...GEO Code 9 Configuring your Mailing System 129 Page 129...
Page 135: ...130 Page 130 9 Configuring your Mailing System...
Page 136: ...9 Configuring your Mailing System 131 Page 131...
Page 147: ......
Page 149: ......
Page 161: ......
Page 163: ......
Page 173: ......
Page 175: ......
Page 183: ......
Page 186: ...Weighing Plateform optional 13 3 Max capacity 3 kg 181 Page 181 13 Specifications...