USER INSTRUCTIONS 

 

5.

 

Follow the directions in the exposure device operating manual for source transfers. 

6.

 

Once the source is loaded into the storage pot, approach the storage container with a radiation 
survey meter and survey the container, guide tubes, and exposure device to ensure the source 
transfer was completed.  Carefully survey the equipment involved in the source transfer. 

7.

 

If the storage container is an SSC-2, then lock the source in the port by sliding the port lock into 
place. 

8.

 

Place the survey meter near the storage port and monitor the meter while carefully removing 
the guide tube from the storage port. 

9.

 

Disconnect the control cable connector from the source assembly connector. 

10.

 

Install the storage port cover over the loaded port. 

11.

 

Identify and record, or place a source ID tag at the loaded port. 

12.

 

Close and lock the storage container according to 

Section 2.4

, if transfers are complete. 

 

2.3. Unloading source from the storage container 

1.

 

Open the storage container according to 

Section 2.1

2.

 

Locate the source to be unloaded from the inner shielded pot. 

3.

 

Follow the directions in the exposure device operating manual for source transfers. 

4.

 

Connect the control cable connector to the source assembly connector. 

5.

 

Attach a compatible source guide tube to the fitting at the storage port. 

6.

 

Attach the other end of the guide tube to the exposure device outlet port. 

7.

 

Unlock the storage port if the container is an SSC-2. 

8.

 

Transfer the source into the exposure device. 

9.

 

Once the source is loaded into the exposure device, approach the storage container with a 
radiation survey meter and survey the container, guide tubes, and exposure device to ensure 
the source transfer was completed.  Carefully survey the equipment involved in the source 
transfer. 

10.

 

Install the storage port cover over the empty port. 

11.

 

Close and lock the storage container according to 

Section 2.4

, if transfers are complete. 

 

2.4. Closing & locking the storage container 

1.

 

Perform a confirmatory radiation survey on and around the storage container to ensure 
radiation measurements are acceptable 

(e.g., ≤ 200 mR/hr (2 mSv/hr) on the surface)

4

 

Summary of Contents for Sentinel SSC-2

Page 1: ...Models SSC 2 SSC 4 SOURCE STORAGE CONTAINERS User Instructions MAN 056 December 2015...

Page 2: ...ther than the source connector during hook up to the drive cable the radiation emitting source assembly must never be touched by hand or handled unshielded up close Special confirmatory surveys must b...

Page 3: ...e resulted from the use of such product in accordance with instructions given by or referred to by the manufacturer QSA Global Inc assumes no liability or responsibility for the usage of any radioacti...

Page 4: ...nges users within the USA must be specifically licensed to do so Applications for a license should be filed with the Materials Licensing Section of the appropriate U S Nuclear Regulatory Commission re...

Page 5: ...2 USER INSTRUCTIONS 3 2 1 Opening unlocking the storage container 3 2 2 Loading sources into the storage container 3 2 3 Unloading source from the storage container 4 2 4 Closing locking the storage...

Page 6: ...um DU Lead with DU insert Weight 120 pounds 54 kg 165 pounds 75 kg Capacity Isotope 2 x 120 Curies Ir 192 Se 75 4 x 100 Curies Ir 192 Se 75 Overall Diameter 15 inches 38 cm Overall Height 19 inches 48...

Page 7: ...TECHNICAL SPECIFICATION Figure 1 Cutaway view of the Storage Container SSC 4 Shield Pot Shown 2...

Page 8: ...container 2 1 Opening unlocking the storage container 1 Perform a confirmatory radiation survey on and around the storage container to ensure radiation measurements are acceptable 2 If radiation measu...

Page 9: ...Open the storage container according to Section 2 1 2 Locate the source to be unloaded from the inner shielded pot 3 Follow the directions in the exposure device operating manual for source transfers...

Page 10: ...tep 3 Inspect the contents for damage or missing components Refer to Figure 1 4 Attach the cover and cover clamp band 5 Install the lock bolt into the cover clamp band Ensure the clamp band is tight e...

Page 11: ...r to its first use after removal from storage Acceptable results of a radio assay must indicate removable contamination in less than 185 Bq 0 005 Ci Evaluation of depleted sources for return to QSA Gl...

Page 12: ...ipment Damaged cropped modified or contaminated source assemblies may require special handling and special transport containers Notify the authorized recipient for specific instructions in these circu...

Page 13: ...3 2216 Sales Service SENTINEL Loma Systems QSA Global Inc U Lomy 1069 334 41 Dobrany Czech Republic Telephone 420 377 183 843 Email SENTINELSales QSA GLOBAL com Website www qsa global com All goods an...

Reviews: