background image

 

14

 

 

Hold

 

finger

 

or

 

pen

 

on

 

the

 

whiteboard

 

for

 

about

 

2S

 

to

 

achieve

 

mouse

 

right

 

click

 

function.

 

 

 

 

 

 

 

 

 

Trouble

 

Shooting

 

Trouble

 

Shooting

 

Failure

 

Phenomenon/Feature

Possible

 

Cause

 

Solution

 

Flow!Works

 

Server

 

was

 

not

 

started.

 

Start

 

the

 

Server.

 

Flow!Works

 

Server

 

is

 

not

 

running.

 

Flow!Works

 

Server

 

was

 

not

 

installed.

 

Install

 

the

 

Server.

 

Whiteboard

 

was

 

not

 

connected

 

with

 

computer.

 

Use

 

cable

 

provided

 

to

 

connect

 

the

 

computer.

 

Whiteboard

 

fails

 

to

 

self

inspection.

 

Check

 

whether

 

there

 

are

 

objects

 

pressing

 

against

 

the

 

whiteboard.

 

If

 

there

 

are,

 

please

 

clear

 

them

 

away.

 

Drive

 

icon

 

is

 

red.

 

Drive

 

damage.

 

Reinstall

 

the

 

drive

 

after

 

uninstallation.

 

Whiteboard

 

fails

 

to

 

work

 

Drive

 

icon

 

is

 

green.

 

The

 

positioning

 

is

 

inaccurate.

 

Re

positioning

 

according

 

to

 

the

 

reference

 

above.

 

Parts

 

of

 

calibration

 

cross

 

points

 

are

 

invisible

 

on

 

the

 

whiteboard.

 

Calibration

 

cross

 

cursor

 

is

 

invisible

 

on

 

the

 

whiteboard.

 

Projector

 

mis

position

 

cause

 

Image

 

projected

 

exceeding

 

the

 

whiteboard

 

area.

 

Adjust

 

the

 

projector.

 

Summary of Contents for Infrared Interactive Whiteboard

Page 1: ...tents Foreword 2 System Requirement 3 Product Introduction 4 Mounting Guidance 5 Calibration 7 Whiteboard Calibration 7 Hot Key Calibration 9 Hints Tips 12 Whiteboard Use 13 Trouble Shooting 14 Specif...

Page 2: ...IR interactive whiteboard Plastic pens or Qpen optional provided by QOMO are available to use with whiteboard The product adopts infrared positioning technology Keep the whiteboard away from external...

Page 3: ...ort 256 colors Hard disk 1G Support resolutions 800 600 1024 768 1280 1024 USB1 1 port Configuration Recommended CPU 2 0GHz 86 Memory 512M or above Display card support 256 colors Hard disk 2G Support...

Page 4: ...tly into Flow Works Pro Software including PowerPoint Word Excel MEPG JPEG AVI and etc Touch System QOMO Interactive Whiteboard is sensitive to touch speed and can be used as a high resolution interac...

Page 5: ...5 Mounting Guidance Hardware Mounting Wall...

Page 6: ...between the Spring Washer and and nuts 4 Check and screw the nuts Interactive System Construction 1 Make sure the whiteboard has been well fixed before interactive system construction 2 Adjust the cor...

Page 7: ...Whiteboard Calibration 1 Flow Works Server Pro appears at the lower right of taskbar after drive installation as figure 1 Left click Flow Works Server Pro and proceed to main drive interface as figur...

Page 8: ...on to pop up calibration interface as figure 3 Click and hold the center of the cross Complete the calibration process as instructed Figure 3 3 Confirmation interface pops up after positioning Click Y...

Page 9: ...Flow Works Pro server offers two kinds of hotkeys calibration either 12 keys calibration together or separately is accepted Calibration together 1 Click Hotkey Settings button to enter into the hotkey...

Page 10: ...10 Figure 5 2 Choose Calibrate Altogether and click Calibrate button to enter into hotkey calibration interface Tap corresponding position according to the red arrow s point as figure 6 Figure 6...

Page 11: ...eference as figure 7 Figure 7 4 Click Yes to save when confirmation window pops up after it completes as figure 8 Figure 8 Calibrate Separately 1 Choose Calibrate Separately and click every single Cal...

Page 12: ...12 Figure 9 2 Every single hotkey calibration reference as figure 10 Figure 10 Hints Tips To ensure the writing accuracy use the pen provided rather than a finger to...

Page 13: ...the instructions to calibrate Whiteboard Use Whiteboard can work normally after calibration even without opening Flow Works Pro Some common operations can be implemented rapidly through whiteboard Cl...

Page 14: ...d to connect the computer Whiteboard fails to self inspection Check whether there are objects pressing against the whiteboard If there are please clear them away Drive icon is red Drive damage Reinsta...

Page 15: ...Conflict with antivirus software Close the antivirus software The writing delayed Too many programs are running at the same time Shut down programs not used for the moment Hardware configuration is to...

Page 16: ...ed and used in accordance with the instructions may cause harmful interference to radio communications However there is no guarantee that interference will not occur in a particular installation If th...

Page 17: ...Please keep this manual for future reference 2 This manual is available for all series of infrared whiteboard so there may be some differences between the actual product and the product explained in t...

Reviews: