background image

8

9

Dimensions

QTG50L-ETN

QTG60L-ETN

18mm SCREW & NUT

LB18

LW18

SZ18

QZ18

SL18

QL18

 QTG50L-ETN/ QTG60L-ETN - 

Pole Mounting Type Model

Ø18

Ø18

32

34

24

Ø70

51

M18x1.5

THREAD

75

52

69

Ø18

Ø18

66

52

38

34

46

50

58

Ø28

1/2" PF

4-Ø5 HOLES

12x22

CABLE ENTRY

Ø70

50

Ø18

4-Ø5 HOLES

PCD 56

4-Ø5.5 HOLES

2-Ø8.5 HOLES

PCD

 54~

56

Ø18

Ø18

Ø70

51.5

67

4-Ø5.5 HOLES

Ø18 CABLE ENTRY

PCD 54~5

6

Ø90

4-Ø6 HOLES

Ø11 CABLE ENTRY

66

45.5

PCD 73

Summary of Contents for QTG50(M)L

Page 1: ...oduct in locations that subjects it to excessive dust or water other than the conditions designated by the IP protection ratings indicated for each product Failure to follow these instructions may cau...

Page 2: ...ax 0 110A R Red A Amber G Green 4 DC12V DC24V AC110V 220V 0 450A 0 290A Max 0 130A R Red A Amber G Green B Blue 5 DC12V DC24V AC110V 220V 0 525A 0 335A Max 0 150A R Red A Amber G Green B Blue W White...

Page 3: ...OLUME CONTROL LEVER 199 249 299 349 399 LAYER 1 2 3 4 5 L1 L2 120 28 5 135 50 13 5 L1 357 407 457 507 557 M24x1 5 THREAD 12 12 5 123 13 5 50 L2 PCD 50 360 3 M4 BOLT BUZZER VOLUME CONTROL LEVER 199 249...

Page 4: ...net network by referring left diagram 2 Please be sure that the power supply shall meet the product specification accordingly Product Installation 2 Because the ETN tower light is connected to a hub w...

Page 5: ...alue of users network information identified in the previous chapter subnet mask gateway in each text box and set a different IP_Addr than your PC Apply the settings by pressing the Write button The p...

Page 6: ...by removing the upper lens kit from the lower one Assembling lens kits Put the two lens kits together by aligning the upper lens I mark and the lower lens I mark together Lock the two kits by twisting...

Page 7: ...HOLES 12 Mounting Hole Specifications Machine holes on the mounting surface referring to the diagram below Remove the flange nuts from bolts and place the product through the mounting surface holes Fa...

Page 8: ...ETN Pole Mounting Type Model 18 18 32 34 24 70 51 M18x1 5 THREAD 75 52 69 18 18 66 52 38 34 46 50 58 28 1 2 PF 4 5 HOLES 12x22 CABLE ENTRY 70 50 18 4 5 HOLES PCD 56 4 5 5 HOLES 2 8 5 HOLES PCD 54 56...

Page 9: ...ting Type Model 46 70 81 32 34 46 M24x1 5 THREAD 2 8 5 HOLES 69 5 52 38 34 46 50 70 1 2 PF 4 5 HOLES 12x22 CABLE ENTRY 33 24 70 55 4 5 5 HOLES PCD 54 56 24 4 5 HOLES 90 55 5 PCD 73 24 35 24 24 90 4 6...

Page 10: ...ing the sky Sounder part shall not be facing the sky BEACON SIGNALING LIGHT Power cord inlet part shall not be facing the sky Power cord inlet part shall not be facing the sky SIGNAL TOWER LIGHTS HEAV...

Page 11: ...MEMO...

Page 12: ...2 Qidong 33 Haiyan Road Qidong High tech Industrial Development Zone Qidong Jiangsu Province China Tel 86 513 8384 9999 Fax 86 513 8384 9910 Product Operation Inquiry Customer Support 82 51 620 4100 Y...

Reviews: