UM-PRORUNNER_Mk5-1.2-EN-US
51
Installation
6.3.3
Vertical transport < 1400 kg
1.
Check the type plate for the exact weight
of the machine.
2.
Use a suitable hoisting system that
complies with local regulations.
3.
Attach a suitable hoisting belt or hoisting
chain (A) to the lifting eye (B).
4.
If necessary, put the machine in the
vertical position. Make sure that the
machine does not tip over after it has been
put in the vertical position.
5.
Make sure that the bottom side of the
machine (C) is not dragged along the
ground during transport.
6.3.4
Vertical transport > 1400 kg
1.
Check the type plate for the exact weight
of the machine.
2.
Use a suitable hoisting system (A) that
complies with local regulations.
3.
Install a yoke (D) onto the upper beam (B).
4.
Attach a suitable hoisting belt or hoisting
chain to the hoisting eyes (C) on the yoke.
5.
Follow the rules for lifting using a yoke.
6.
Make sure that the bottom side of the
machine is not dragged along the ground
during transport.
DANGER
•
The hoisting eyes (B) are suitable for a maximum weight of 1400 kg.
Machines up to 7 - 8 m high can be moved using the hoisting eyes.
•
If the weight to be moved is more than 1400 kg, use a suitable lifting
device (yoke). Refer to section
.
B
C
A
B
C
C
Note
The hoisting eyes on the lift (C) are suitable for a maximum weight of 1400 kg.
Refer to section 6.3.3 if the weight to be moved is less than 1400 kg.
A
B
C
C
D
Summary of Contents for PRORUNNER Mk5
Page 1: ...User Manual PRORUNNER Mk5 Version1 2 26 06 2014...
Page 12: ...About this manual 12 UM PRORUNNER_Mk5 1 2 EN US...
Page 22: ...Safety 22 UM PRORUNNER_Mk5 1 2 EN US 3 5 Safety symbols on the machine Terminal 12 Nm...
Page 38: ...Description 38 UM PRORUNNER_Mk5 1 2 EN US...
Page 58: ...Installation 58 UM PRORUNNER_Mk5 1 2 EN US...
Page 84: ...Maintenance vertical conveyor 84 UM PRORUNNER_Mk5 1 2 EN US...
Page 94: ...Maintenance belt conveyor 94 UM PRORUNNER_Mk5 1 2 EN US...
Page 98: ...Maintenance gravity roller conveyor 98 UM PRORUNNER_Mk5 1 2 EN US...
Page 108: ...Maintenance driven roller conveyor 108 UM PRORUNNER_Mk5 1 2 EN US...
Page 120: ...CE declaration of conformity 120 UM PRORUNNER_Mk5 1 2 EN US...
Page 174: ...Exploded views of product conveyors 174 UM PRORUNNER_Mk5 1 2 EN US...
Page 198: ...Electrical circuit diagrams 198 UM PRORUNNER_Mk5 1 2 EN US...
Page 200: ...Assembly instruction 200 UM PRORUNNER_Mk5 1 2 EN US...