UG-1083 ePAQ-9400
-
Copyright © 2016 QEI.
Test Panel
21
E = Relay Point #3 Option
0 = None
1 = Two Momentary KUP Type
2 = Two Momentary KUEP Form C Type
3 = Two Momentary KUEP Form X Type
4 = One Latching KUL Type
5 = One Latching Form C (277VAC)
6 = Two Momentary Form C (277VAC)
F = Mounting Option
1 = Rack Mount Brackets, Front of enclosure
2 = Rack Mount Brackets, Rear of enclosure
3 = Rack Mount Brackets, Bottom of enclosure
Note 1: External keying voltage source is provided by the customer. An isolated or non-
isolated source can be used. The TB3C right-most end terminals may be used as tie points
for the customer’s keying voltage. The proper keying voltage option must be selected to
match the customer provided keying voltage source.
Note 2: Internal non-isolated keying voltage source is tapped from the ePAQ-9400 input
voltage source, and appears at terminal block TB3C right-most end terminals. The proper
keying option must be chosen to match the ePAQ-9400 input voltage option.
Note 3: Internal isolated 24Vdc keying voltage source from a DC-DC converter.
Note 4: 277Vac Input Tol: =+5% Max.
14 Test Panel
14.1
Introduction
The ePAQ-94
00 (“ePAQ”) contains special “test panel” software that the user can
access through the front panel USB maintenance port (Port 1, connector J3) or
remotely through the Ethernet port (Port 5, connectors J6 or J7).
The Test Panel has security features, available over either the standard USB
connection or over a remote connection via Ethernet port 5 fiber or copper. This can
be configured through the QEI
ConfigWiz 2.0 Admin
software to require a user name
/ password or support encryption over the Ethernet connection. See the appropriate
ConfigWiz 2.0 addendum in the ConfigWiz 2.0 user guide for further information.
Prior to placing a ePAQ into operation, the test panel can be used as a post-
installation checkout tool, to ascertain that the ePAQ is correctly wired to the field
devices. When used for this purpose, the test panel permits off-line (no connection
with the Master Subsystem) testing of status, analog, accumulator (pulse count), and
control points.
Summary of Contents for ePAQ-9400
Page 1: ...UG 1083 ePAQ 9400 User s Guide December 2018 ...
Page 4: ......