background image

4

5

INSTaLLaTIoN aND oPeraTIoN MaNUaL SoLar MoDULeS GeNeraTIoN 3 (G3) – HaNwHa Q CeLLS GMBH – Na

INSTaLLaTIoN aND oPeraTIoN MaNUaL SoLar MoDULeS GeNeraTIoN 3 (G3) – HaNwHa Q CeLLS GMBH – Na

For the electrical data and additional information of the solar modules please refer to the respective currently valid data sheets available at 
www.q-cells.com.

ProDUCT LINe

Q.Pro-G3 / Q.PLUS-G3

Q.Pro BFr-G3

Type

Polycrystalline / Q.ANTUM

Polycrystalline

Length [

in

 (mm)]

65.7 (1670)

65.7 (1670)

Width [

in

 (mm)]

39.4 (1000)

39.4 (1000)

Height [

in

 (mm)]

1.38 (35)

1.38 (35)

Area [yd² (m²)]

2 (1.67)

2 (1.67)

Weight [lb (kg)]

41.89 (19.0)

41.89 (19.0)

Max. system voltage V

SYS

 [V]

1000

1000

Max. series fuse rating [A]

20

20

Permissible operating  

temperature range [°F (°C)]

–40 to +185 (–40 to +85)

Junction box protection class

IP67 with bypass diode

Connector protection class

IP68

IP68

Fire protection class

C

C

Snow load [Pa]

1

5,400

5,400

Wind load [Pa]

1

5,400

5,400

Certificates

UL 1703; VDE Quality Tested; CE-compliant; IEC 61215 (Ed.2) see page 9 et sqq.; IEC 61730 
(Ed.1) Application Class A

Validity

These instructions are only valid for crystalline solar modules from 
Q CELLS. Q CELLS assumes no liability for damage resulting from 
failure to observe these instructions. 

 

Ä

Please observe the wiring and dimensioning of the system.

 

Ä

The installer of the system is responsible for compliance with all 
necessary safety regulations during set-up and installation.

Q CELLS assumes no liability on the basis of these instructions. 
Q CELLS is only liable in the context of contractual agreements or 
in the context of accepted guarantees. Q CELLS accepts no other 
responsibility for the functionality and safety of the modules. 

 

Ä

Please observe the instructions for any other system components 
that may be part of the complete solar power system. It may be 
necessary to carry out a structural analysis for the entire project. 

 

Ä

If your questions are not satisfactorily answered in the manual, 
please contact your system supplier. 

Additional information can be found on our website at: 
www.q-cells.com. 

Information for the operator

 

Ä

Please keep this manual for the entire life of the solar power 
system.

 

Ä

Please contact your system supplier for information concerning 
the formal requirements for solar power systems.

 

Ä

Please be sure to contact the relevant local authorities and energy 
providers regarding regulations and permit requirements prior 

to installation of the solar power system. Your financial success 
depends on the fulfillment of these requirements. 

other applicable documents

This installation manual is only valid in combination with the 
following technical information.

DoCUMeNT TyPe

Product data sheet

Packaging and transport of crystalline modules

 

MISUSE OR INCORRECT USE OF SOLAR MODULES VOIDS THE 
LIMITED WARRANTY AND MAY CREATE A SAFETY HAZARD 
AND RISK PROPERTY DAMAGE. THIS INCLUDES IMPROPER 
INSTALLATION OR CONFIGURATION, IM PROPER MAINTENANCE, 
UNINTENDED USE, AND UNAUTHORIZED MODIFICATION. 

1 INTroDUCTIoN

2.1  Technical specifications

2 PLaNNING

ProDUCT LINe

Q.Peak-G3

Q.Peak BLk-G3

Type

Monocrystalline

Monocrystalline

Length [

in

 (mm)]

65.7 (1670)

65.7 (1670)

Width [

in

 (mm)]

39.4 (1000)

39.4 (1000)

Height [

in

 (mm)]

1.38 (35)

1.38 (35)

Area [yd² (m²)]

2 (1.67)

2 (1.67)

Weight [lb (kg)]

41.89 (19.0)

41.89 (19.0)

Max. system voltage V

SYS

 [V]

1000

1000

Max. series fuse rating [A]

20

20

Permissible operating  

temperature range [°F (°C)]

–40 to +185 (–40 to +85)

Junction box protection class

IP67 with bypass diode

Connector protection class

IP68

IP68

Fire protection class

C

C

Snow load [Pa]

1

5,400

5,400

Wind load [Pa]

1

5,400

5,400

Certificates

UL 1703; VDE Quality Tested; CE-compliant; IEC 61215 (Ed.2) see page 9 et sqq.; IEC 61730 
(Ed.1) Application Class A

1

   tested according to IEC 61215

Summary of Contents for Q.Peak BLK-G3

Page 1: ...Valid for North America Q Pro G3 Q Pro BFR G3 Q Peak G3 Q Peak BLK G3 Q PLUS G3 Installation and Operation Manual...

Page 2: ...amage Categories Danger Risk of fatal injury Attention Risk of serious injury or damage to property Note Risk of damage to product Units Where both metric and U S units for example inches are shown me...

Page 3: ...complete solar power system It may be necessary to carry out a structural analysis for the entire project If your questions are not satisfactorily answered in the manual please contact your system sup...

Page 4: ...ufficient rear ventilation of the module Guarantees long term stability Has electrochemical series that prevent corrosion among different metals Allows for stress free expansion and contraction due to...

Page 5: ...0 380 CL1 9 65 17 52 245 445 7 09 14 96 180 380 2 Planning 2 3 Mounting options Specifications Module type Mounting option Clamping range1 IN Mm Allowed static load2 PA TEST LOAD acc IEC 61215 PA Q PR...

Page 6: ...termining the maximum number of modules in the string Parallel Connection Modules may be damaged by the occurrence of reverse currents caused by module defects ground leaks or defective insulation Ens...

Page 7: ...ng until installation Store the modules securely in cool and dry rooms The packaging is not weatherproof Danger Risk of fatal injury due to electric shock Do not install damaged modules Inform your ve...

Page 8: ...to electric shock Only use dry insulated tools Do not carry out the installation alone Only install undamaged modules and components Do not drill any other holes 3 2 Preparation of installation 3 Inst...

Page 9: ...wiring with extreme caution Ensure that the modules are disconnected at the inverter prior to separation Be sure to observe the specified time intervals after switching off the inverter High voltage c...

Page 10: ...ock Ensure that all electrical components are in a proper dry and safe condition A module with 47 24in long 1 210 mm cable can be wired as a 2nd next neighbor 2nd next neighbor Wiring without a return...

Page 11: ...rformance Maintenance The system should be inspected by an installer annually to check the following all system components sit securely and are corrosion free the connection is secure and all electric...

Page 12: ...vine Center Drive Suite 1250 Irvine CA 92618 USA TEL 1 848 748 59 96 FAX 1 949 748 59 84 EMAIL q cells usa q cells com WEB www q cells us Subject to change without notice Hanwha Q CELLS GmbH Installat...

Reviews: