35
Communication Connection
9.3 Energy Meter Connection
To connect an energy meter:
1
Insert two wires into the RS-485 gland.
■
Dispose of the blind plug in the RS-485 gland after opening the gland nut.
■
Required Wire: 1 to 2.5 mm
2
, 28 to 12 AWG
F
2
Strip the wires.
■
Strip length: 7 to 8 mm
3
Remove the terminal block from the RS-485 connector.
4
Insert the wires to the terminal block.
■
Port 1: RS485_POS
■
Port 2: RS485_NEG
5
Secure the wires to the terminal block using
a flat-head screw driver.
■
Screw: M3
■
Torque: 0.5 N·m
1
2
6
Insert the terminal block to the RS-485 connector.
Note
For details about connecting and setting an energy meter, see "12 Energy Meter Installation" on page 41.