Qazqa Mossa WL PIR Black 89437 Manual Download Page 2

2

INSTALLATION

Installation the bulkhead light, please referring to the Fig.2
1.  Installation by a licensed electrician and according to IEC wiring 

Regulation.

2.  Switch power off at the meter box and ensure that there is no 

power to the lamp.

3

Ensure install the unit according to the indicator of symbol direc

-

tion on cover (

 

UP)

4.  Remove the Lampshade by Screwdriver, see figure.
5.  Unscrew the Screw (A) and remove the Transparent Plate.
6.  Mark the mounting hole positions onto the wall. Drill and plug the 

wall at the marked positions. Screw the lamp body to wall with 
suitable Mounting Screws (supplied)

7.  Connecting the main power wires to the Terminal Block (see the 

relative symbols—Fig.2), the Cable must pass through the Wiring 
Rubber Gasket.

8.  Insert the Max. 60Watt / 230V~ 50Hz incandescent Bulb into the 

Lamp-holder (E27)

9.  Re-screw Transparent Plate.
10. Re-fit the Lampshade by hand.
11. After finish the mounting, you can adjust the detection area and 

working state of PIR Sensor.

 

 

L N

Fig. 2 Mounting and Wiring to Treminal

Screwdriver

Transparent 

Plate

Terminal Block

Bulb

Mounting Scerws

(2PCS)

Screw (A)

Lampshade

UP

118 mm

256 mm 114 mm

Reviews: