background image

Display

Voltage
Current
Frequency
Power
Today Power
Total in Power
Graph

Display Load voltage
Display Load current
Display Load frequency
Display Load active power
Display today’s Load power
Display the amount of power used in today's Load
Display Load power graph (Daily/Weekly/Monthly/Yearly)
(If you want to see the next graph, touch graph screen.) 

Description

[ Figure 8-8 : Load Information Display ]

[ Table 8-6 : Load Information Display Description ]

      8.5.3 Load Information display

75 

Operating Test

Summary of Contents for Q.VOLT-G2 HYB-4.6kW.1.1

Page 1: ...connection is required to use all functions of the ESS system If you have a problem please contact the Q CELLS After Sales Service The Specifications of the product may be modified without prior noti...

Page 2: ...osure Package 3 1 2 Removing the Battery Enclosure Package 3 1 3 Checking Components on the Packing List 3 2 Checking for Damage in Delivery 3 3 Identifying Q HOME ESS HYB G2 4 Installation 4 1 Select...

Page 3: ...tial Installation Information 7 1 Information Input Administrator 7 2 System Information Input Stage 7 3 PC Direct Connection and Local Setting Value 7 3 1 PC Direct Connection Flow 7 3 2 LAN Cable Co...

Page 4: ...Components 10 2 1 Fuse Check 10 2 2 Input Output Terminal Check 10 2 3 DC Link Check 10 3 Battery Maintenance 10 3 1 Checking Battery Problem 10 3 2 Battery Exchange Procedure 10 4 The List of Replac...

Page 5: ...Table 6 1 Description of Short Bar Location Table 6 2 Recommended Meter List Table 6 3 Recommended Meter List Table 8 1 LED Indications Table 8 2 Screen Configuration Information Table 8 3 Status Des...

Page 6: ...igure 4 6 Bracket on the Wall in Step 4 Figure 4 7 Bracket on the Wall in Step 5 Figure 4 8 Bracket on the Wall in Step 6 Figure 4 9 Floor Mount Part List Figure 4 10 Floor Mount assembly Step 1 7 Fig...

Page 7: ...Select country Figure 7 7 Main page Login Figure 7 8 Main page User Manual Figure 7 9 Main page User Manual Download Figure 8 1 LCD Location Figure 8 2 Initial Indication Screen on Power On Figure 8 3...

Page 8: ...ion The user manual and installation manual can be downloaded from the product download section at https www q cells com The specifications of the product can be changed for improvement without notice...

Page 9: ...t Both direct and alternating current Alternating current Description Symbols Description Symbols Information in this Manual I 02 Beware dangerous voltage The ESS operates at high voltage All works re...

Page 10: ...d personnel only Disconnect main power before maintenance Turn off the Battery System before maintenance Electric shock hazard Do not remove cover or disassemble Explosive gas Do not expose to flame i...

Page 11: ...ation manual Any substitute use of this device random change in any of its parts and use of components other than sold or recommended by Q CELLS will nullify the product s guarantee For example Q CELL...

Page 12: ...85 GRID LOAD TOUCH DISPLAY PCS Battery Pack 2 Battery Pack 1 PV1 Array PV2 Array Circuit Breaker Single Phase Loads L PE N Circuit Breaker Circuit Breaker Single Phase Loads PE N L PE BAT BAT BMS CAN...

Page 13: ...ID LOAD TOUCH DISPLAY PCS Battery Pack 2 Battery Pack 1 PV1 Array PV2 Array PE BAT BAT BMS CAN PE PE BAT BAT BMS CAN BAT BMS CAN PV 1 PV 2 LAN DRM RS 485 GRID LOAD TOUCH DISPLAY PCS Battery Pack 2 Bat...

Page 14: ...the positive and negative terminals with metallic object All work on the ESS and electrical connections must be carried out by qualified personnel only Q HOME ESS HYB G2 provides a safe source of ele...

Page 15: ...ponse Mode See page 40 for more information Bracket Connected Part 2 3 Product Overview The Q HOME ESS HYB G2 includes the PV INVERTER Battery charger discharger Li Ion Battery and EMS The basic opera...

Page 16: ...I Terminal and Circuit Breaker Cable Gland for power cables BMS Communication Connector Bracket Connected Part Table 2 2 Part Description of Battery Pack Figure 2 7 Part View of Battery Pack 2 3 2 Bat...

Page 17: ...ange nominal voltage Max discharge current Max charge current Battery nominal capacity DOD Depth of Discharge Range Battery voltage range nominal voltage Max discharge current Max charge current Q SAV...

Page 18: ...lia New Zealand Battery nominal capacity DOD Depth of Discharge Range Battery voltage range nominal voltage Max discharge current Max charge current Max charge power Rated power Short circuit current...

Page 19: ...s DC pole and DC pole are not permitted to be grounded Double Grounding Point Q HOME ESS HYB G2 must be connected to an additional ground on the enclosure The grounding method on the enclosure is as f...

Page 20: ...x upside down 3 Open the box 4 Remove the cover on the back of the product 5 Remove the protective cover on the side of the product 6 Prepare the lower bracket for the INVERTER 3 Down Bracket Screws 1...

Page 21: ...Place the system on the installation location 2 Turn the box upside down 3 Open the box 4 Remove the cover on the back of the product 5 Remove the protective cover on the side of the product 6 Prepare...

Page 22: ...613074AAAD 67613075AAAD 6547310111AD 6547310114AD 4925310128KD 4925310129KD 4635150094WD Table 3 1 Component Description of INVERTER Figure 3 3 Packing List of INVERTER A H I J B C D E F G 3 1 3 Check...

Page 23: ...01202000000 752647202000000 752603202000000 752904202000001 752904202000002 C Cable Gland INVERTER 3ea Grid Load Battery Battery 2ea A Adaptor If using more than one battery a separate adaptor is requ...

Page 24: ...mber Serial No Device specific characteristics Certification Lists Warnings and Notification Q HOME ESS HYB G2 Q CELLS ESS For Home with Hybrid Inverter G2 17 I Package Removal and Inspection Q HOME E...

Page 25: ...0 Hz IEC 62109 1 2 AS 62040 1 1 AS NZS 4777 2 IEC 62116 IEC 60068 2 52 Max PV Current Per String IMPP Isc 15 A 20 A Product Name Q HOME ESS HYB G2 Hybrid Inverter Q VOLT G2 HYB 5kW 1 1 LOAD Output 20...

Page 26: ...tially hazardous circumstance such as excessive heat or electrolyte mist may occur due to improper operating conditions damage misuse and or abuse The following safety precautions and the warning mess...

Page 27: ...posed to solar rays must be avoided as it may cause power limitation phenomena in the INVERTER with a resulting decreased energy production by the system premature wear of the electrical electromechan...

Page 28: ...during servicing unless suitable means are provided to carry out the operation Install vertically with a maximum inclination of 5 backward If this condition cannot be met the INVERTER could undergo de...

Page 29: ...acket Step 2 1 Detach Anchor bolt Step 2 2 Insert the Anchor bolt into the bracket CAUTION There is risk of injury if the ESS is lifted incorrectly or dropped while being transported or when attaching...

Page 30: ...pper bracket 23 I Installation Figure 4 6 Bracket on the Wall in Step 4 Figure 4 5 Bracket on the Wall in Step 3 STEP 3 UPPER BRACKET 1 UPPER BRACKET 2 Step 4 If you secure the upper bracket Use the b...

Page 31: ...5 STEP 5 Step 5 Lift the INVERTER and secure it to the upper bracket Step 5 1 Hang the INVERTER to upper bracket Step 5 2 Secure the lower bracket Step 6 The method of mounting the Battery is the sam...

Page 32: ...with bolts to the bottom Mount Plate 1ea Battery Inverter Stand Column 2ea D Bracket 2ea L Bracket 4ea Screw M8x16 8ea Screw M6x8 4ea Nut M8 2ea 340 mm 430 mm 40 mm STEP 1 Step 2 L Bracket Screw M8x16...

Page 33: ...ng electrical parts inside the system Follow the guidelines below when handling the Li Ion Battery Do not intentionally short circuit the positive and negative terminals with a metallic object Do not...

Page 34: ...parallel with the two independent PV inputs PV1 PV2 A PV string must not be commonly connected to the two input terminals of the Q HOME ESS HYB G2 That is make sure not to connect the split wiring fro...

Page 35: ...f the INVERTER Please refer to the figure of the drawing for installation and maintenance Figure 5 2 INVERTER Bottom View Figure 5 3 INVERTER Front inside View I J K M L A C D B F E G H No Part List A...

Page 36: ...of the drawing for installation and maintenance Figure 5 4 Battery Bottom View Figure 5 5 Battery Front inside View D E C E C A B No Part List A B C D E Cable Gland BMS Communication Connector BMS Boa...

Page 37: ...wise to disassemble Insert the flat head screwdriver as shown below and lift it up If bottom cover cannot be removed even after removing all screws the four screws of the top cover needs to be loosen...

Page 38: ...ker of the Battery are disconnected before starting electrical cable connections Battery replacement can only be carried out by qualified personnel If the Battery needs to be changed it should be plac...

Page 39: ...ker and terminal in Battery case Figure 5 8 Battery Pack and INVERTER Connection Figure 5 9 Cable Gland of Q HOME ESS HYB G2 3 Connect the and wire PCS to the marked terminal Battery And then connect...

Page 40: ...r is composed of BMS Communication Adaptor and connect from outside If you use more than one Battery 8kwh or more use the adaptor Amphenol for Battery communication EX If you use 3 Battery you need 2...

Page 41: ...in proper order For the connectors PV1 PV1 PV2 and PV2 between the distribution box and the Q HOME ESS HYB G2 input the following types of connectors are used Refer to Chapter 5 1 2 for cable specifi...

Page 42: ...he distribution box in the PV side and the Female part is attached to the Q HOME ESS HYB G2 The two products are properly docked when connected together When inserting or pulling out the PV connector...

Page 43: ...Where a residual current operated protective RCD or monitoring RCM device is used for protection in case of direct or indirect contact RCD should be type B Type A or type AC RCD would only be accepta...

Page 44: ...nd Size of Cable The following lists the insulation strip length details for each conductor cross section Refer to Chapter 5 1 2 for cable specification The ground wire should be grounded by crimping...

Page 45: ...cable and be cables are not loose Electrical Connections I 38 5 6 2 Grid Connection Method To connect the Grid of the INVERTER you need 3 connections Ground Neutral and Phase In any case connection of...

Page 46: ...le into the INVERTER through the Battery cable gland Strip 9 mm of cable from the cable to connect to Load Connect the Battery cable to the Filter Board CN401 After lifting the handle of connector ins...

Page 47: ...onding Relationship Between Cables and Pins 568B Pin 1 White orange Pin 2 Orange Pin 3 White green Pin 4 Blue Pin 5 White blue Pin 6 Green Pin 7 White brown Pin 8 Brown DRM 1 5 DRM 2 6 DRM 3 7 DRM 4 8...

Page 48: ...turer However the digital energy meter must be selected The Figure 5 15 shows the electrical cable connection and the communication lines of the digital energy meter Refer to the Figure 5 20 and the c...

Page 49: ...rrectly before reassembling front lower cover Figure 5 22 Front Cover Assembly Process 1 2 Hold the front lower cover with both hands As shown in the Figure 5 13 slide the bottom cover at an angle and...

Page 50: ...Assembly Process 2 Screwing Torque 1 4 Nm 3 As shown in the Figure 5 23 Use a hexagon wrench size M4 to fasten the bolt clockwise Please do not close the cover here because it will still be necessary...

Page 51: ...ween the LAN terminal and the Router Use the Ethernet crimper to crimp the cable and connect the cable to RJ45 plug The RJ45 cable is responsible for communication between the web and the PMS board Fi...

Page 52: ...t IP Table 6 1 Description of Short Bar Location Figure 6 4 Communication Terminal Energy Meter RS485 CAN I O EXT Emergency CN906 CN2 CN1 CN3 CN4 CN5 CN905 CN901 CN902 CN904 3 4 Using this pins is per...

Page 53: ...s shown in the Figure 6 5 separate housing from connector And press the lock with a flat head screwdriver to connect the communication cable The RS 485 meter communication cable must be used within 10...

Page 54: ...RS 485 RS 485 RS 485 Bi direction Bi direction Bi direction Table 6 3 Recommended Meter List CN906 CN2 CN1 CN3 CN4 CN5 CN905 CN901 CN902 CN904 Figure 6 6 Energy Meter Connection Method Figure 6 7 Ener...

Page 55: ...IP address Connect LAN cable from laptop to board Turn on system Connect laptop to board via internet browser Input settings Turn off system Remove short bar from pin Turn on system 7 3 1 2 Network c...

Page 56: ...Confirm that power is off 2 Connect two short bars to pin 1 2 and 7 8 on Out Connector Board as shown in the Figure 7 2 It makes Control Board to have static IP address so that you can access to Syste...

Page 57: ...connect to internet 10 Turn on AC circuit breaker at grid side turn PV switch to ON positon 7 3 3 2 Network connection 1 Turn on AC circuit breaker at grid side turn PV switch to ON position 2 Connec...

Page 58: ...ID function and click SELECT button 51 I Entering Initial Installation Information 7 3 4 SIM System Install Manager Battery Installing 7 3 4 1 Main Page 7 3 4 2 Battery Install Initialize 1 2 Select a...

Page 59: ...es you want to install Step 4 Then click the START button Step 5 If it completes normally the same screen appears If there is a problem return to Step 1 Then click the FINISH button to complete Initia...

Page 60: ...Select Auto function and click SELECT button Step 3 Select the number of batteries you want to install Step 4 Click the ENTER button 7 3 4 3 Battery installation process 4 3 1 2 53 I Entering Initial...

Page 61: ...cation Cable of the first Battery you want to install Step 6 Then click the Configure ID button Step 7 Wait until the battery connected the communication Cable is installed Entering Initial Installati...

Page 62: ...batteries SAVE BMS ID button will Appear as below Then click the SAVE BMS ID button to complete The installation Step 9 If there are still batteries left to install the following Screen appears Repeat...

Page 63: ...ial ID Step 3 Click Next Button Step 4 All Battery Pack Communication Cables are Connected Open circuit breakers Entering Initial Installation Information I 56 1 2 3 Step 5 Click Next Button Step 6 Ch...

Page 64: ...ick Stop Button and Check Communication Line Go to Step 2 Initial ID 12 Step 14 Click Next Button Step 15 Connect the communication cable of the 2nd battery Step 16 If there is Failure Message Click S...

Page 65: ...d regulation Select an operation mode The dynamic optimizer provides an advanced control mode Select number of batteries Select PMS external mode if the 3rd party gateway is connected 7 3 6 3 Date Tim...

Page 66: ...exceeds FTransition it increases charging active power according to the increase in frequency until it reaches fPmin fPmax Hz Frequency where power output level is maximum fStop_CH Hz Frequency where...

Page 67: ...from 60 absorption to 60 supply and the default reactive power is set to 0 Discharging mode It decreases input active power from the frequency of VW1 and it does not exceed the designated active powe...

Page 68: ...s the Export Soft Limit the inverter decreases the output apparent power below the Export Soft Limit Level Generation Hard Limit If the inverter output active power exceeds the Generation Hard Limit f...

Page 69: ...to 100 0 33 to 0 66 DE Reactive Power SetPoint You can set the inverter output power factor as well as leading over and lagging under of reactive power Cos Value Response time ms Default Values Param...

Page 70: ...63 I Entering Initial Installation Information 7 3 6 6 Save and Restart Save onto the system after all the procedures above are completed...

Page 71: ...I 64 7 3 7 Checking the settings information 7 3 7 1 Firmware version Select a maintenance menu Check the firmware version and country 7 3 7 2 Region Grid regulation Select a installation settings me...

Page 72: ...is lower 7 4 Web Page Connection 7 4 1 Web Page Connection Open an Internet browser of your laptop or smart phone then enter the designated address Then the system information input page pops up Inpu...

Page 73: ...Entering Initial Installation Information I 66 Figure 7 6 Select country Figure 7 5 Select warranty 3 Check your warranty provider and click yours 4 Select your country...

Page 74: ...he login window If you have no account please join as a Member 2 Click the Join Membership link 3 In order to join as a member you must consent to the terms for personal privacy protection The terms h...

Page 75: ...page User Manual Download 6 After login click User Manual Button 7 In the pop up window of the user manual find the registration manual i e Server Register Quick Guide and click the file download butt...

Page 76: ...played when internal communication is normal The time setting is automatically renewed when connected to the network The Figure 8 3 is a screen display when ESS Software PMS PCS is updated 8 Operating...

Page 77: ...o Ethernet network Display status when connecting to meter Go to home display Go to previous screen Go to next screen Display current PV power Display current Load power Display current Battery power...

Page 78: ...ome menu structure If you touch next or previous button the screen is displayed as shown in the Figure 8 5 The description of each screen refer to Chapter 8 5 71 I Operating Test Figure 8 5 Home Menu...

Page 79: ...Operation Mode This system is composed of six modes PV Auto PV Only Battery discharge Standby Maintenance forced charge and Stand Alone Back up The event check status should not be considered as any s...

Page 80: ...current PV2 voltage Display current PV2 current Display current PV2 power Display today s PV power Display the mount of PV power Display PV power graph Daily Weekly Monthly Yearly If you want to see t...

Page 81: ...tor Display today s power received from the Grid Display today s electricity sent to the Grid Display the amount of electricity received from the Grid Display the amount of electricity sent to the Gri...

Page 82: ...Load active power Display today s Load power Display the amount of power used in today s Load Display Load power graph Daily Weekly Monthly Yearly If you want to see the next graph touch graph screen...

Page 83: ...tate of health Display today s Battery charge power Display Battery power factor Display the amount of Battery charge power Display the amount of Battery discharge power Display Battery power graph Da...

Page 84: ...f this product Country using this product IP Address Software version of this product Software version of PMS Software version of PCS master Software version of PCS slave Software version of HMI Softw...

Page 85: ...lt occurred The time the fault occurred Type of fault See Chapter 9 1 If there are more than 10 errors the first error is cleared Description Figure 8 11 Error Information Display Table 8 9 Error Info...

Page 86: ...rotection BDC I TZM P D01P WEB Display HMI Display Description Measures The product stops the generating process because a significant protection event has occurred Wait until the event message disapp...

Page 87: ...emoved until the time limit is reached it is converted to a significant event BDC2 Charge RMS Over Current Protection BDC2 COC P D13P The product stops the generating process because a significant pro...

Page 88: ...message is removed it automatically returns to normal If it is not removed until the time limit is reached it is converted to a significant event BDC Over Voltage Peak Protection BDC OVP P D23P The p...

Page 89: ...d it automatically returns to normal If it is not removed until the time limit is reached it is converted to a significant event INV Over Watt Protection INV OW P G03P The product stops the generating...

Page 90: ...ting process because a significant protection event has occurred Wait until the event message disappears After the event message is removed it automatically returns to normal If it is not removed unti...

Page 91: ...dard level Residual Current Monitoring Unit Sudden Protection RCMU SD P G23P The product stops the generating process because a significant protection event has occurred Wait until the event message d...

Page 92: ...t event Load Over Current Peak Protection Load OCP P L02P The product stops the generating process because a significant protection event has occurred Wait until the event message disappears After the...

Page 93: ...normal If it is not removed until the time limit is reached it is converted to a significant event Load Over Watt Protection Load OW P L08P Please check PV1 and wiring If the connection is successful...

Page 94: ...l If it is not removed until the time limit is reached it is converted to a significant event PV1 Over Current Peak Protection PV1 OCP P S07P Please check PV2 and wiring If the connection is successfu...

Page 95: ...until the event message disappears After the event message is removed it automatically returns to normal If it is not removed until the time limit is reached it is converted to a significant event PV2...

Page 96: ...y returns to normal If it is not removed until the time limit is reached it is converted to a significant event DCLINK RMS Under Voltage Protection DCLINK UV P S32P The product stops the generating pr...

Page 97: ...Events Protection The product stops the generating process because a significant protection event has occurred Wait until the event message disappears After the event message is removed it automatica...

Page 98: ...it is converted to a significant event BAT2 Charge Over Current Protection BAT2 CHG OC P B11P The product stops the generating process because a significant protection event has occurred Wait until th...

Page 99: ...mmunication Protection BAT2 COM P B17P Problem Confirmation I 92 Power reset of the system is required If the symptom still occurs after reset repair of BMS or PCS Control Board is necessary BAT2 Addi...

Page 100: ...normal when the minimum cell or rack voltage goes above the limit value BAT3 Cell or Rack Under Voltage Protection BAT3 CEL UV P B25P When the maximum cell temperature is above protection level thus t...

Page 101: ...wer reset of the system is required If the symptom still occurs after reset repair of BMS or PCS Control Board is necessary BAT4 Cell Voltage Sensing Data Hold Protection BAT4 CEL V HOLD P B33P Proble...

Page 102: ...it is converted to a significant event BAT5 Charge Over Current Protection BAT5 CHG OC P B41P The product stops the generating process because a significant protection event has occurred Wait until th...

Page 103: ...rature goes below the limit value BAT5 Cell Over Temp Protection BAT5 CEL OT P B46P When the minimum cell or rack voltage is below protection level thus terminating the system Automatically returns to...

Page 104: ...occurs repeatedly it is necessary to replace the Control Board DSP Slave FRAM Communication Error Protection DSPS FRAM P P22P It is an unregistered fault Turn off and restart the system Please contact...

Page 105: ...Voltage rating 600 Vac Vdc Current rating 30 A 10 2 2 Input Output Terminal Check Check the input output terminal when the device fails to work with significant errors Check the input output terminal...

Page 106: ...source prior to connecting or disconnecting Battery terminals Determine if the Battery is inadvertently grounded If that is the case separate Battery from ground Contact with any part of a grounded Ba...

Page 107: ...OME ESS HYB G2 consists of a PV stick with male female parts manufactured by Weidmuller 10 4 The List of Replaceable Parts The Table 10 1 shows the list of parts replaceable for maintenance of this sy...

Page 108: ...discharge power Battery technology DC DC converter technology Over voltage Category 1 Battery Pack 2 or more Battery Pack 4 0 kWh 9 8 A 2 0 kW 6 3 kWh 15 6 A 15 6 A 4 0 kWh x Pack 17 A 3 0 kW 6 3 kWh...

Page 109: ...e value for relative humidity Operating temperature Suggested operating temperature Storage temperature INVERTER topology Noise emission Intend to use Wet condition Pollution degree Maximum altitude r...

Page 110: ...input voltage MPPT voltage range Max inverter backfeed current Max input current per string Max input short circuit current for each MPPT Max PV port input short circuit fault current A Number of ind...

Page 111: ...rotective class I II III Degree of protection Max permissible value for relative humidity Operating temperature Suggested operating temperature Storage temperature INVERTER topology Noise emission Int...

Page 112: ...perature before discharging again Item Cell body module temperature Cell body temperature Max Cell V Maximum Charge Current 0 A 3 5 A 7 A 9 8 A 3 5 A 2 1 A Q SAVE G2 4 kWh T 0 C 0 C T 10 C 10 C T 25 C...

Page 113: ...fication Maximum Discharge Current 0 A 7 A 10 5 A 19 6 A 10 5 A 7 A 0 A 15 6 A 10 A 3 A T 20 C 20 C T 10 C 10 C T 0 C 0 C T 40 C 40 C T 50 C 50 C T T 10 C 10 C T 50 C 50 C T 55 C 55 C T Q SAVE G2 4 kW...

Page 114: ...ternal electrical cable are removed from the Battery and product Open the bottom cover of this product Disconnect AC Load and Battery connections from the INVERTER Remove all communication lines from...

Page 115: ...ESS HYB G2 at a temperature ranging from 20 to 60 C 12 4 Disposal If the Battery or the product life has expired the regulations for the disposal of electronic products in that region must be followed...

Page 116: ...YB G2 Hybrid Inverter Q VOLT G2 HYB 5kW 1 1 LOAD Output 20 C 50 C Operating Temperature Mfg Date No 5min Hanwha Solutions Corporation 86 Cheonggyecheon ro Jung gu Seoul Korea 04541 Hanwha Q CELLS GmbH...

Page 117: ......

Page 118: ...turer Warranty Provider Hanwha Solutions Corporation 86 Cheonggyecheon ro Jung gu Seoul Korea 04541 Specifications subject to technical changes Q CELLS Installation Manual Q HOME ESS HYB G2_2021 11_Re...

Reviews: