INSTALLATION AND OPERATION MANUAL SOLAR MODULES Q.PEAK DUO XL-G10.2 / G10.c – Q CELLS

INSTALLATION AND OPERATION MANUAL SOLAR MODULES Q.PEAK DUO XL-G10.2 / G10.c – Q CELLS

Validity

These instructions are only valid for crystalline solar modules from 
the company Q CELLS as specified at chapter „2.1 Technical 
Specifications“. Q CELLS assumes no liability for damage resulting 
from failure to observe these instructions.

 

Ä

Please observe the wiring and dimensioning of the system.

 

Ä

The installer of the system is responsible for compliance with all 
necessary safety regulations during set-up and installation.

Q CELLS assumes no liability on the basis of these instructions. 
Q CELLS is only liable in the context of contractual agreements 
or in the context of accepted guarantees. Q CELLS accepts no 
other responsibility for the functionality and safety of the modules.

 

Ä

Please observe the instructions for any other system compo-
nents that may be part of the complete solar power system. 
It may be necessary to carry out a structural analysis for the 
entire project.

 

Ä

If your questions are not satisfactorily answered in the manual, 
please contact your system supplier.

Additional information can be found on our website at 
www.q-cells.us.

Information for the Operator

 

Ä

Please keep this installation manual for the entire life of the 
solar power system.

 

Ä

Please contact your system supplier for information concerning 
the formal requirements for solar power systems.

 

Ä

Please be sure to contact the relevant local authorities and 
energy providers regarding regulations and permit requirements 
prior to installation of the solar power system. Your financial 
success depends on the fulfillment of these requirements.

Other applicable documents

This installation manual is only valid in combination with the following 
technical information.

DOCUMENT TYPE

Product data sheet

Packaging and transport information

MISUSE OR INCORRECT USE OF SOLAR MODULES VOIDS THE 
LIMITED WARRANTY AND MAY CREATE A SAFETY HAZARD 
AND RISK PROPERTY DAMAGE. THIS INCLUDES IMPROPER 
INSTALLATION OR CONFIGURATION, IM PROPER MAINTENANCE, 
UNINTENDED USE, AND UNAUTHORIZED MODIFICATION.

Fig. 1: 

External dimensions (in inch (mm)) and components for 
Q.PEAK DUO XL-G10.2 and Q.PEAK DUO XL-G10.c

41.1

"

(1045 mm)

51.5

"

 (1308 mm)

87.2

"

 (2216 mm)

1.38

"

 (35 mm)

4 × Mounting slots (DETAIL A)

8 × Drainage holes

0.12 × 0.24

"

 (3 × 6 mm)  

Frame

39.5

"

(1003 mm)

17.9

"

 (454 mm)

Label

4 × Grounding holes, Ø 0.18

"

 (4.5 mm)

4 × Drainage holes

≥ 13.8

"

 (350

 mm)

≥ 27.6

"

 (700

 mm)

15.7

(400 mm)

4 × Mounting slots system Tracker (DETAIL B)

DETAIL A

0.63

"

 (16 mm)

0.33

"

 (8.5 mm)

0.83" (21

 

mm)

DETAIL B

0.39

"

 (10 mm)

0.28" (7 mm)

0.87" (22

 

mm)

39.4

"

(1001 mm)

31.1

"

 (790 mm)

For additional information see the relevant datasheet of the module provided at www.q-cells.us.

PRODUCT LINE

Q.PEAK DUO XL-G10.2
Q.PEAK DUO XL-G10.c

Type

Q.ANTUM DUO Z

Length [in]

87.2 (2216 mm)

Width [in]

41.1  (1045 mm)

Frame height [in]

1.38  (35 mm)

Area [yd²]

2.78 (2.32 m²)

Weight [lbs]

58.4  (26.5 kg)

Max. system voltage V

SYS

1500 V  (IEC) / 1500 V  (UL)

Max. series fuse rating

20 A

Permitted Module Temperature
on Continuous Duty

–40 °F to +185 °F (–40 °C to +85 °C)

Junction box 
protection class

≥ IP67 with bypass diode

Connector protection class

IP67 or IP68

Fire rating based on  
ANSI / UL  61730

C / TYPE  1

Max. test load 
Push / Pull

1

 [lbs/ft²]

113 / 63
(5,400 Pa / 3,000 Pa)

Max. design load 
Push / Pull

1

 [lbs/ft²]

75 / 42
(3,600 Pa / 2,000 Pa)

Middle rail

Yes

Certificates

Quality Controlled PV by TÜV Rheinland; CE-compliant; IEC 61215:2016; IEC 61730:2016;  
PV module classification: Class II; UL 61730

1

 Test and design load in accordance with IEC 61215:2016, depending on mounting options (see section „2.3 Mounting Options“)

1  INTRODUCTION

2  PLANNING

2.1  TECHNICAL SPECIFICATIONS

Summary of Contents for Q.PEAK DUO XL-G10.c

Page 1: ...Valid for North America INSTALLATION AND OPERATION MANUAL Q PEAK DUO XL G10 2 G10 c solar module series...

Page 2: ...are responsible for com pliance with all applicable statutory requirements and regulations The following regulations and standards must be upheld at all times during the installation operation and mai...

Page 3: ...ble documents This installation manual is only valid in combination with the following technical information DOCUMENT TYPE Product data sheet Packaging and transport information MISUSE OR INCORRECT US...

Page 4: ...tress free expansion and contraction due to tem perature fluctuations Ensurethatnoadditionalforcesareappliedthroughthemounting system into the module except for the wind and snow loads Additional forc...

Page 5: ...YSTEM INSTALLATION ON MOUNTING POINTS INSTALLATION WITH INSERTION PROFILES NOT PERMITTED TRACKER INSTALLATION ON MOUNTING POINTS TB1a 35 8 908 TB2a 35 8 908 35 8 28 1 17 9 908 713 454 TB1b 28 1 713 TB...

Page 6: ...the module TC1 Ensure minimum support depth of 12mm on the backside and 10mm on the front side of the module FB1 FB2 TB1a TB2a TB1b TB2b mFB2 Use M8 corrosion proof screws and washers diameter 15 8mm...

Page 7: ...ng factor of 125 percent 80 percent derating which might be applicable Please follow the valid national guidelines for the installation of electrical systems refer to section 690 8 of the NEC for an a...

Page 8: ...out the installation alone Only install undamaged modules and components Do not modify the module e g do not drill any additional holes 3 INSTALLATION 3 2 PREPARATION OF INSTALLATION confirmation let...

Page 9: ...Ensure that the modules are disconnected at the inverter prior to separation Be sure to observe the time intervals specified by the inverter manufacturer after switching off the inverter Make sure th...

Page 10: ...ick click DANGER Risk of fatal injury due to electric shock Ensure that all electrical components are in a proper dry and safe condition SOLAR 4 ELECTRICAL CONNECTION 4 3 CONNECTION OF MODULES DANGER...

Page 11: ...and backing nut Care should be taken to avoid the use of grounding hardware of dissimilar metals which may lead to corrosion Option B Integrated grounding methods The Q CELLS modules can be bonded wi...

Page 12: ...ing to the state of the art and taking into account all relevant safety issues and general product properties e g but not restricted to electrical safety mechanical stability load limits depending on...

Page 13: ...ithout notice Q CELLS Installation manual solar modules Q PEAK DUO XL G10 2_G10 c_2022 01_Rev02_NA 24 INSTALLATION AND OPERATION MANUAL SOLAR MODULES Q PEAK DUO XL G10 2 G10 c Q CELLS Free the substru...

Reviews: