Use solar cables for the connection at the junction
box outlet.
Ä
Only interconnect connectors of the same type
and manufacturer.
Ä
Use minimum No. 12 AWG copper wires insulated
for a minimum of 90 °C for field connections.
NOTE! Module damage may occur!
Ä
Ensure that the cabling is not under mechanical stress
(Comply with bending radius of ≥ 2.36 in (60 mm)).
Ä
Ensure that the cables do not run between module
and mounting rail or structure (danger of pinch).
Ä
Position the wiring on the solar modules that
additional shading is avoided.
Ä
Ensure for a tight connection between the plugs.
Plugs click together audibly.
EN
click
click
click
click
DANGER! Risk of fatal injury due to electric shock!
Ä
Ensure that all electrical components are in a
proper, dry, and safe condition.
4 ELECTRICAL CONNECTION
4.3 CONNECTION OF MODULES
Ä
Do not connect modules with different orientations
or angles of inclination in the same string.
SOLAR
Ä
Ensure that all necessary safety and functional
tests have been carried out according to
applicable standards.
NOTE! Module damage may occur!
Ä
Ensure that the plug connections are secured away
from any water-channelling surface.
Ä
Integrate the system into the existing lightening
protection system in accordance with the
applicable local regulations.
WARNING! Fire Risk!
Ä
Do not use light concentrators (e.g. mirrors or
lenses).
Ä
Ensure that the cabling is not exposed and / or
hanging and is protected from dirt, moisture and
mechanical friction.