background image

INSTALLATION AND

OPERATION MANUAL

Q.PEAK DUO ML-G9.4 solar module series

Valid for Africa, Europe, LatinAmerica, South America

Summary of Contents for Q.PEAK DUO ML-G9.4

Page 1: ...INSTALLATION AND OPERATION MANUAL Q PEAK DUO ML G9 4 solar module series Valid for Africa Europe LatinAmerica South America...

Page 2: ...her applicable stipulations such as country specific regulations for pressure equipment operational safety hazardous goods and environmental protection Regulations and requirements specific to the sys...

Page 3: ...to contact the relevant local authorities and energyprovidersregardingregulationsandpermitrequirements prior to installation of the solar power system Your financial success depends on the fulfillment...

Page 4: ...ture Ensures sufficient rear ventilation of the module Avoid the usage of different metals to prevent contact corrosion Allows for stress free expansion and contraction due to temperature fluctuations...

Page 5: ...0mm and clamp depth 10mm The system installer is responsible for the determination of location specific load requirements CL1a at high loads 5400 4000Pa The clamp position is variable in the given ran...

Page 6: ...rence of reverse currents caused by module defects ground leaks or defective insulation Ensure that the maximum reverse current load capacity indicated in the data sheet is met In order to limit rever...

Page 7: ...Note Module damage may occur Never step on modules Do not subject modules to any mechanical stress Do not allow any objects to fall onto modules 3 INSTALLATION 3 1 SAFETY AND TRANSPORT Danger Risk of...

Page 8: ...esult from the separation of a closed circuit These can result in life threatening injuries The danger increases when several modules are connected in series Please be aware of that the entire open ci...

Page 9: ...ed personnel see page 3 Ensure correct polarity Use solar cables for the connection at the junction box outlet Only interconnect connectors of the same type and manufacturer Use minimum 4mm2 copper wi...

Page 10: ...he cabling is not exposed and or hanging and is protected from dirt moisture and mechanical friction 4 ELECTRICAL CONNECTION 4 4 AFTER INSTALLATION No dry cleaning or use of rotating brushes Modules m...

Page 11: ...ectrically conductive parts WARNING Risk of falling due to unsecured access Never access the installation area alone or without taking adequate security precautions Please commission a trade specialis...

Page 12: ...e 17 21 06766 Bitterfeld Wolfen Germany TEL 49 0 34946699 23222 FAX 49 0 34946699 23000 EMAIL sales q cells com WEB www q cells com Subject to change without notice Q CELLS Installation manual solar m...

Reviews: