background image

INSTALLATION AND

OPERATION MANUAL

Q.PEAK DUO ML-G10.X solar module series

Valid for Africa, Europe, LatinAmerica, South America

Summary of Contents for Q.PEAK DUO ML-G10.X Series

Page 1: ...INSTALLATION AND OPERATION MANUAL Q PEAK DUO ML G10 X solar module series Valid for Africa Europe LatinAmerica South America...

Page 2: ...nal safety hazardous goods and environmental protection Regulations and requirements specific to the system Any applicable laws and requirements in particular inter national country specific regional...

Page 3: ...ements Other applicable documents In addition to this Manual following technical information are relevant DOCUMENT TYPE Product data sheet Packaging and transport information Fig 1 External dimensions...

Page 4: ...r stress free expansion and contraction due to temperature fluctuations Ensure that no additional forces are applied through the mounting system into the module except for the wind and snow loads Addi...

Page 5: ...10 Q PEAK DUO BLK ML G10 Q PEAK DUO ML G10 a Q PEAK DUO ML G10 a Q PEAK DUO BLK ML G10 a Q PEAK DUO BLK ML G10 a INSTALLATION ON MOUNTING POINTS Q PEAK DUO ML G10 Q PEAK DUO ML G10 Q PEAK DUO ML G10 2...

Page 6: ...stability of the mounting system including clamps has to be evaluated by the system supplier The listed test load values have been determined with the following clamp parameters clamp width 40 mm and...

Page 7: ...rrence of reverse currents caused by module defects ground leaks or defective insulation Ensure that the maximum reverse current load capacity indicated in the data sheet is met In order to limit reve...

Page 8: ...Note Module damage may occur Never step on modules Do not subject modules to any mechanical stress Do not allow any objects to fall onto modules 3 INSTALLATION 3 1 SAFETY AND TRANSPORT Danger Risk of...

Page 9: ...result from the separation of a closed circuit These can result in life threatening injuries The danger increases when several modules are connected in series Please be aware of that the entire open c...

Page 10: ...led personnel see page 3 Ensure correct polarity Use solar cables for the connection at the junction box outlet Only interconnect connectors of the same type and manufacturer Use minimum 4mm2 copper w...

Page 11: ...light concentrators e g mirrors or lenses Ensure that the cabling is not exposed and or hanging and is protected from dirt moisture and mechanical friction 4 ELECTRICAL CONNECTION 4 4 AFTER INSTALLATI...

Page 12: ...w and ice carefully without force e g with a very soft broom Do not scratch off dirt Module cleaning has to be done by qualified personnel according to the state of the art and taking into account all...

Page 13: ...17 21 06766 Bitterfeld Wolfen Germany TEL 49 0 34946699 23222 FAX 49 0 34946699 23000 EMAIL sales q cells com WEB www q cells com Subject to change without notice Q CELLS Installation manual solar mo...

Reviews: