background image

4

5

INSTALLATION AND OPERATION MANUAL SOLAR MODULES DUO-G5.X – HANWHA Q CELLS – EN

INSTALLATION AND OPERATION MANUAL SOLAR MODULES DUO-G5.X – HANWHA Q CELLS – EN

For additional information see the relevant datasheet of the module provided at www.q-cells.com.

PRODUCT LINE

Q.PEAK DUO-G5.X
Q.PEAK DUO BLK-G5.X

Type

Q.ANTUM

Area [m²]

1.69

Frame height [mm]

32

Weight [kg]

18.7

Max. system voltage V

SYS

 [V]

1000

Max. reverse current [A]

20

Permissible temperature range

–40 °C to +85 °C (–40 °F bis +185 °F)

Junction box protection class

IP67 with bypass diode

Connector protection class

IP68 and IP65

Fire protection class

C

Push load [Pa]

1

5400

Pull load [Pa]

1

4000

Certificates

VDE Quality Tested; CE-compliant; IEC 61215 (Ed.2) see page 9 et sqq.;

 

IEC 61730 (Ed.1) Application Class A

‘Test Load’ in accordance with IEC 61215 and ‘Design Load 

× 

1.5’ in accordance with UL 1703

Validity

These instructions are only valid for crystalline solar 

modules  from  the  company  Q CELLS  as  specified 
at  chapter  „2.1  Technical  specifications“.  Q CELLS 

assumes no liability for damage resulting from failure to 
observe these instructions. 

 

Ä

Please observe the wiring and dimensioning of the 
system.

 

Ä

The installer of the system is responsible for compliance 
with all necessary safety regulations during set-up and 
installation.

Q CELLS assumes no liability on the basis of these 
instructions. Q CELLS is only liable in the context of 
contractual agreements or in the context of accepted 
guarantees. Q CELLS accepts no other responsibility for 
the functionality and safety of the modules. 

 

Ä

Please observe the instructions for any other sys-
tem components that may be part of the complete  
solar power system. It may be necessary to carry out a 
structural analysis for the entire project. 

Additional information for the Operator

 

Ä

Please keep this manual for the entire life of the solar 
power system.

 

Ä

Please contact your system supplier for information 
concerning the formal requirements for solar power 
systems.

 

Ä

Please be sure to contact the relevant local authorities 
and energy providers regarding regulations and permit 
requirements prior to installation of the solar power 

system. Your financial success depends on the fulfillment 

of these requirements. 

Other applicable documents

In addition to this Manual following technical information 
are relevant:

DOCUMENT TYPE

Product data sheet

Packaging and transport information

1 INTRODUCTION

2.1  Technical specifications

2 PLANNING

Fig. 1: 

External dimensions (in mm) and components for

 

 

Q.PEAK DUO-G5.X, Q.PEAK DUO BLK-G5.X, 

DETAIL A

16mm

8.5mm

24.5mm

980mm

1685mm

4 × Mounting slots (DETAIL A)

Frame

1000mm

951mm

32mm

8 × Drainage holes

352.5mm

EN

6 × Grounding points ø 4.5mm

1100

mm

1100

mm

Summary of Contents for Q.PEAK DUO BLK-G5.X

Page 1: ...Valid for Africa Asia Europe Latin America South America Q PEAK DUO G5 X SOLAR MODULE SERIES INSTALLATION AND OPERATION MANUAL ...

Page 2: ...er Risk of fatal injury Attention Risk of serious injury or damage to property Note Risk of damage to product Safety Regulations In particular the installer as well as the operator of a module is responsible for compliance with all applicable statutory requirements and regulations Ä Ä Unless otherwise specified by any laws or regulations the following stipulations must be upheld at all times durin...

Page 3: ...ns during set up and installation Q CELLS assumes no liability on the basis of these instructions Q CELLS is only liable in the context of contractual agreements or in the context of accepted guarantees Q CELLS accepts no other responsibility for the functionality and safety of the modules Ä Ä Please observe the instructions for any other sys tem components that may be part of the complete solar p...

Page 4: ...s acting on the module are relayed to the mounting substructure Ensures sufficient rear ventilation of the module Guarantees long term stability Avoid the usage of different metals to prevent contact corrosion Allows for stress free expansion and contraction due to temperature fluctuations Ä Ä Ensure that no mechanical stresses e g caused by vibra tions twisting or expansion applied to on the modu...

Page 5: ...g further current blocking measures a maximum of two module strings may be operated in parallel on a single inverter or MPP tracker 2 Layout with string fuses Place fuses for each string of modules at the plus and minus ends Observe the maximum permitted number of strings as indicated in the specifications provided by the respective string fuse manufacturer and the technical guidelines NOTE When i...

Page 6: ...rely in cool and dry rooms The packaging is not weatherproof DANGER Risk of fatal injury due to electric shock Ä Ä Do not install damaged modules Ä Ä Inform your distributor of any damages immediately 3 1 Safety and transport 3 INSTALLATION NOTE Module damage may occur Ä Ä Never lift or move the module with the connection cables or junction box Ä Ä Carry modules upright and horizontally as shown N...

Page 7: ...isk of fatal injury due to electric shock Ä Ä Only use dry insulated tools Ä Ä Do not carry out the installation alone Only install undamaged modules and components Ä Ä Do not modify the module e g do not drill any additional holes 3 2 Preparation of installation 3 INSTALLATION Ä Ä Maintain an interval of at least 10 mm between two modules 10mm 1 0 m m Option 2 Ä Ä Install the module at the 4 moun...

Page 8: ...ime intervals specified by the inverter manufacturer after switching off the inverter DANGER Risk of fatal injury due to electric shock Ä Ä Never open the junction box Ä Ä Do not remove bypass diodes DANGER Risk of fatal injury due to electric shock Ä Ä Never touch live contacts with bare hands Ä Ä Cover connectors by suitable protective caps until installation DANGER Risk of fatal injury due to e...

Page 9: ...y and safe condition 4 3 Connection of modules 4 ELECTRICAL CONNECTION Ä Ä To avoid complex cabling arrangements it is often advantageous to rotate some modules 180 Ä Ä Module orientation can clearly be identified from the front side by the serial number and barcode labelled behind the module glass on the side with negative connection cable Inverter 180 180 Ä Ä Ensure that all necessary safety and...

Page 10: ...arly by certified personnel Ä Ä The time intervals and extent of the inspection can depend on local circumstances e g salt ammonia content in the air high humidity etc The customer operator must inform himself about time intervals and extend of necessary inspections Ä Ä Inspections have to be performed especially after extraor dinary events e g storm hail high snow loads etc Ä Ä During the inspect...

Page 11: ...nallee 17 21 06766 Bitterfeld Wolfen Germany TEL 49 0 34946699 23222 FAX 49 0 34946699 23000 EMAIL service q cells com WEB www q cells com Subject to change without notice Hanwha Q CELLS Installation manual solar modules DUO G5 X_2017 10_Rev01_EN ...

Reviews: