![Pyramid Reliance Installation & Operation Manual Download Page 7](http://html1.mh-extra.com/html/pyramid/reliance/reliance_installation-and-operation-manual_1632518007.webp)
Figure 3
To install the printer, disconnect all power to the machine.
Mount the Reliance into your machine using the three screws (M4 - .7 x 8mm, Pan Head) and
washers that were provided to you.
Connect the Power Cable from the host machine to the printer.
If you are utilizing the 24 VDC Reliance Power Supply Kit, now is the time to install it in your
machine
Connect the interface cable (USB or RS232) from the machine to the printer.
Make sure that all wiring is properly secured in your machine.
Turn on power to your machine and follow the next step below for installing paper in the
Reliance.
If you are utilizing the Reliance Paper Arm Kit, now is the time to install it on the printer. The
instructions on how to attach this arm are in the shipping box. If not please visit this link for the
instructions:
https://pyramidacceptors.com/pdf/
Reliance-Accessory-Arm-Installation-Guide.pdf
6