64"
12"
INSTALLATION INSTRUCTIONS:
2) Determine location of backstop so the rear panel is perpendicular to a line running from 2nd base
through home plate & so the wings are parallel with the sides of the diamond.
3. Dig holes according to Footing Plan below & Footing Detail on sheet #4. Start with an end post & center
the post in the hole so it rests on the block. Adjust block height as necessary to achieve proper post
height. Plumb & brace in position. Repeat the same procedure for the rest of the Vertical Post. Vertical
Post are Items 7
8
PRODUCT NAME
MODEL NO.
Date: 7/26/2017
Rev: A
Drawn: BDYE
Sheet: 4 of 11
1201-10
ECONOMY BACKSTOP
CL
FOOTING PLAN
8
8
7
7
218
1
2
"
90
1
2
"