
Operating and maintenance instructions
EN
6
LI 2078.05
4. Transport/handling
4.1 Lifting
Use the suitable lifting eyebolt located on the equipment.
4.2 Unpacking and components control
When receiving the machine, check that the packing is intact or if is shows signs of
damages occurred during transportation.
If there is no damage, proceed to the unpacking and check further the machine.
In case damages are found, inform immediately P.V.R. and the carrier.
4.3 Storage
The pumps must be stored or transported without oil and protected from the atmospheric
agents at a temperature between -15°C and 70°C (normal humidity rate max. 95% non
condensing).