4
Installation & Operation Manual
Copyright © Puretec Pty Ltd 2019
Preparing The System
For correct operation & installation it is essential to observe these instructions.
JUN2018
ATS5200.103
Licence N
o. WM 74
593
Australian
Certificat
ion
Services
User Guide
Filtration
& Ultraviolet All in
One Un
it with Weather Cover
Hybrid-
G
HYBRID-M1 UNIT
UV LAMP
SPANNER
USER GUIDE
1. Hybrid-M1 Filter System
2. UV Lamp (in cardboard tube)
3. Bag containing Spanner, Braided Hoses, Power Cord and User Guide
BRAIDED HOSES
POWER CORD
Preparing Your System
Puretec systems are designed to run economically for many years, dependent on the
initial installation and periodical maintenance.
Please read all instructions carefully as failures caused by incorrect installation or
operation are not covered by warranty.
On removing your Hybrid-M1 system from its carton you should check all the
components (especially the lamp), to ensure all are present and have not been damaged
in transportation. You should have:
Summary of Contents for Hybrid-M1
Page 12: ......