Before You Begin

1.  Carefully inspect the unit, including the shipping box as well as the air dryer, for ANY 
DAMAGE CAUSED BY SHIPPING.  If any shipping damage is detected, it is important to 

fi le a claim with the shipping company prior to continuing the installation procedures.

2.  

Read the entire Installation Guide to familiarize yourself with the components and procedures 

before performing the air dryer installation.

3.  

Verify the installation location of the air dryer:

 

•  Well ventilated and free from abrasive dust or chemicals.

 

•  Unobstructed drain or bucket for water dump

 

•  Ambient temperature is between 40° F and 85° F (optimum).  

NOTE:

 Higher temperatures will decrease component lifespan.

 

•  Meets the following power requirements:

 

     •  208 - 230 VAC

 

 

     1 Phase for P10KW

 

 

     3 Phase for P15KW

 

     •  Minimum 30 amp service with a 20 amp slow blow fuse.

 

     •  If hard-wiring directly, minimum of 12 AWG wire must be used.

4.  

Notify the alarm center of the installation and potential for alarms during the process (as necessary).

Required Tools and Materials

Included Contents

(1) P10KW / P15KW Air Dryer
(1) Installation Guide (not shown)
Package located inside the dryer:
 

(1) User’s Guide (not shown)

 

(10’) 3/8” Tubing

 

(1) Purge Muffl er

 

(1) Water Sensor

 

(1) Compressor Connector Tool

•  Large and Medium adjustable wrench
•  7/16” wrench
•  Band cutters or snips
•  1+ gallon of clean tap water 

(DO NOT USE DISTILLED WATER)

•  Small funnel
•  20 amp 250 VAC plug (recommended)
•  Pipe dope or pipe thread tape
•  Cup of soapy water
•  1-inch paint brush (recommended)

Installation Steps

•  Remove the ship-loose contents package.

5

•  Verify that the black orifi ce plug is still  

    installed where shown.

•  Install the purge muffl er (optional).

6

•  Verify that the dryer is powered 

OFF

.

8

•  Using a 7/16” wrench, remove the shipping 

    block from under the compressor plate. 

•  Discard block and bolt.

4

•  Check for loose parts, hoses, or wiring.

3

•  Remove all shipping materials.

•  Place the dryer at the operating location.

1

•  Remove the front panel.

2

•  Install 3/8” drain tubing and route to an 

    unobstructed drain or bucket.

7